In late April 2023, snowmelt and runoff filled the reservoir behind a Bureau of Land Management (BLM) retention dam near Harlem, Montana, to its maximum. The high water exposed a weak area in the earthen dam, where water was quickly seeping and "piping" through, a high risk for a full breach. Staff from two BLM field offices and a nearby grazing permit operator responded, and in August BLM Montana/Dakotas honored them with the State Director's Award for Safety.
What went wrong
The BR-43 dam is rated a Hazard Class Dam. It was built in 1936 and measures 21 feet high and 385 feet long, with a maximum reservoir capacity of 53 acre feet (more than 35 Olympic-sized swimming pools). Had it failed catastrophically with the reservoir full, residents in the inundation zone downstream would likely have faced major flooding, and the water would have reached Montana State Highway 241.
The response
Employees of the Havre and Malta field offices worked out a plan to lower the reservoir to a safe level, easing the pressure on the dam and the chance of failure.

Water diverted from the full BR-43 reservoir to a designated flow channel during the late-April emergency response and repair. BLM photo by Ken Koncilya.
A grazing permit operator whose allotment lies nearby in Blaine County joined the effort. He kept the fuel tank of a high-volume water pump full so it could run day and night, sending water out of the reservoir and down the spillway.

The high-volume pump BLM staff used to help lower the BR-43 reservoir in late April 2023. BLM photo by Ken Koncilya.
With the water down, the engineering equipment operator dug a cut-off trench 120 feet long, 2 feet wide and 4 feet deep, then filled and recompacted it, which repaired the piping. This was a temporary fix, but enough that the civil engineer was confident catastrophic failure was no longer a risk at that time. Permanent repairs were carried out in October 2023.

An excavator digs the cut-off trench at the BR-43 dam. BLM photo by Ken Koncilya.
The recognition
The state director, Sonya Germann, gave the safety award to BLM staff from the Havre Field Office (a rangeland management specialist, a field manager, a civil engineer, another rangeland management specialist, a wildlife biologist and a range technician), an engineering equipment operator from the Malta Field Office, and the grazing permit operator. It was part of the Montana/Dakotas State Director Awards Program for 2023, which recognizes employees and partner organizations in the categories Excellence Through Leadership, Team Accomplishment, Diversity and Equity, Safety and Partnership.
The Havre field manager said the permit operator's willingness to keep the pump fueled and pumping around the clock bought BLM extra time to put a more permanent solution in place, and that the teamwork turned a potentially critical safety situation into a collaborative success story.
Sources
- Bureau of Land Management, "BLM Employees and Permittee Honored for Quick Action to Prevent Potential Dam Failure" (https://www.blm.gov/blog/2024-08-21/blm-employees-and-permittee-honored-quick-action-prevent-potential-dam-failure); the group photograph of award recipients is left out, and recipients are described by job, not name; rewritten in hubnx's own words.