本文へスキップ
Hub Nexus
著者著者はまだいません引き受ける

改善できるところがありますか?変更を提案しましょう。

支援

このページは公開されています。

マガジン The Devonshire Manuscript · 215 ページ中 139 ページ目

| The Devonshire Manuscript facsimile 69v

The Devonshire Manuscript facsimile 69v (Image: DMSEG, CC BY-SA 3.0) |

---

f. [69v]

1    thou haste no faith of him that eke hath none
2    {es}{{th}+u+} but thou must love him nedes bye good reason
3    for as the pro{p2}verbe saith right notable
4    everye thinksekith his semblable /
5    {_on}{_o} {{th}+u+} and thou hast thyne of thy owne condicion
6    yet ys yt not the thing I passe vppon
7    nother hot nor colde is my affection
8    for sins thi hert is this so mutable /
9    thou haste no faith /

10    I demid the trwe with{w+t+}out exception
11    but I perceyve I lacked dastrestion discretion
12    to fasten faith to wordes{es} so dobtable
13    thye thought is to light and variable /
14    to chaunge so oft without  occasion occacoion{_i}{w+t+}
15    thou hast no faith

Commentary

Attributed to Sir Thomas Wyatt,1] this poem was entered by [H8. The speaker complains of his love's fickleness, which was a common theme in medieval and early Tudor courtly love poetry. Wyatt adopts the French rondeau structure for his poem, a form which consists of thirteen lines, two stanzas of four lines, five lines in the last stanza, and a refrain that appears after each stanza. In this particular rondeau, Wyatt omits the refrain after the first stanza.

The two refrains following are aligned to the right.

Works Cited

Textual Notes

Texts Collated

LEge41

Collation

1 thou] Thou LEge41 haste] hast LEge41 eke] LEge41
2 bye good] by LEge41
3 the proverbe saith right] saieth a proverbe LEge41
4 everye thinkg] eche thing LEge41 sekith] seketh LEge41 semblable /] semblable LEge41
5 thyne] thyn LEge41 owne condicion] conditions LEge41
6 ys yt] is it LEge41 vppon] on LEge41
7 nother] nor LEge41 hot] hote LEge41 colde] cold LEge41 is my] ofis myn LEge41
8 sins] syns LEge41 thi] thyn LEge41 this] LEge41 mutable /] mutable LEge41
9 haste] hast LEge41 faith /] faith LEge41
10 demid] thought LEge41 trwe] true / LEge41 without] withoute LEge41
11 perceyve] perceve LEge41 dastrestiondiscretion] discretion LEge41
12 fasten] fasshion LEge41 so doblable] mutable LEge41
13 thye] thy LEge41 and variable /] & variable LEge41
14 without] withoute LEge41 occacion] occasion LEge41
15 thou] Thou LEge41

Where this page came from

This page was imported from Wikibooks. From “The Devonshire Manuscript” on Wikibooks, by its contributors, under CC BY-SA 4.0. Changed here: set as a page; navigation and edit links left out; each image under its own licence, credited in its caption.

Nobody has written it yet — it is the source material at a new address, which is why search engines are asked to skip it and why no one earns from it. It is up for grabs: take it on, and it is yours to rewrite and to earn from.

このページを含むマガジンThe Devonshire Manuscript

言語English

ライセンス: CC BY-SA 4.0 · 出典 en.wikibooks.org

ビュー

コメント

Spinner Logo
バージョン: 2CC0 1.0(パブリックドメイン)
The runaway star that left the Tarantula Nebula
バージョン: 2CC0 1.0(パブリックドメイン)
The Blackwell School, where segregation had no law behind it
バージョン: 2CC0 1.0(パブリックドメイン)
The Eagle Nebula, seen in the infrared
バージョン: 2CC0 1.0(パブリックドメイン)
The house where the Equal Rights Amendment was written
バージョン: 2CC0 1.0(パブリックドメイン)
The Aleutians, the forgotten front of the Second World War
バージョン: 2CC0 1.0(パブリックドメイン)
The Cosmic Cliffs are not cliffs