Students in Engineering 210 at Cal Poly Humboldt worked in groups of three or four to build a truss bridge from balsa wood and super glue. The group called KAD built one that held 201 lbs, weighed 303 grams and won its lab period.

The finished KAD bridge

Photo: AKewl13 on Appropedia, CC BY-SA 3.0.

The rules

RequirementValue
Span36 in, resting on two surfaces with a 1/2 overlay on either side
Minimum height4 in
Minimum width4 in
Minimum load24 lbs
MaterialsBalsa wood and super glue only

Two prototypes

The design copied a typical Howe bridge: right triangles mirrored over the center. The first prototype used plastic members, small plastic plates at the joints and metal screws, to test the construction at the real scale of the project. An exact scale model was not possible because the members were longer than the desired height and width.

The first prototype, testing the Howe design

Prototype 1 testing the Howe design. Photo: AKewl13 on Appropedia, CC BY-SA 3.0.

The same prototype showed where force goes. With weights hung at the center and sensors on members near them, the team found which members carried the most load, so it could reinforce them. The cross members along the top and bottom took very little force compared with most of the side members.

The first prototype, testing forces on the bridge

Prototype 1 testing forces. Photo: AKewl13 on Appropedia, CC BY-SA 3.0.

A second prototype was for practicing the angled cuts on the diagonal members and finding the best cut. It showed that two-sided cuts were needed to line up the center lines of all members and strengthen the joints.

The second prototype, testing joint construction

Prototype 2 testing joint construction. Photo: AKewl13 on Appropedia, CC BY-SA 3.0.

The final design

The bridge measured 36 by 5 by 5 inches. Side members were 1/2 by 1/2 inch balsa, cross members 1/4 by 1/4 inch, and the gusset plates on the sides and top 1/8 by 3 inch balsa. Member center lines met at each joint, covered by 1.5 by 1.5 inch gusset plates on the sides and slightly smaller ones on top.

How it was built

  1. Cut notches in the ends of the vertical members so glue sinks in and reinforces the joints, then cut and glue the verticals onto a long horizontal member.
  2. Glue the bottom horizontal member onto the verticals.
  3. Cut and glue the diagonal members.
  4. Cut and glue gusset plates over the side joints.
  5. Add gusset plates to the top of the joints, which also helped to glue on the cross members.

Vertical members glued to a long horizontal member

Photo: AKewl13 on Appropedia, CC BY-SA 3.0.

Diagonal members glued into place

Photo: AKewl13 on Appropedia, CC BY-SA 3.0.

Result

The bridge held 201 lbs at a mass of 303 grams. The team reports a load-to-mass ratio of 301 after conversions, meaning it carried 301 times its own weight. It won the lab period and bent the metal rod that held the weights.

201 lbs hanging from the bridge shortly before it collapsed

Photo: AKewl13 on Appropedia, CC BY-SA 3.0.

Sources

  • Appropedia, ENGR210 KAD Bridge, a student project page; licence CC BY-SA 4.0 as recorded for the page, with photos by AKewl13 on Appropedia credited as CC BY-SA 3.0. Changed here: rewritten and shortened, photos of the team members left out; rewritten in hubnx's own words.

Комментарии

Spinner Logo

Ещё на тему «Природа»

Автор: Hub Nexus Nomad
From the glowing waves of the ocean to fireflies lighting up the night sky, bioluminescence is one of nature’s most mesmerizing phenomena. This article dives into the science behind bioluminescence, its role in nature, and how this glowing phenomenon has inspired both innovation and awe in the human world.
CC BY 4.0
Adaptive Evolution
CC0 1.0 (общественное достояние)
FEQinput helps hydrologists read, search, edit and run input files for FEQ, the USGS model of unsteady flow in open channels, showing descriptions of input lines to help new users overcome a steep learning curve.
CC0 1.0 (общественное достояние)
The United States Congress designated the Cottonwood Canyon Wilderness in 2009 and it now has a total of 11,667 acres. All of this wilderness is located in Utah and is managed by the Bureau of Land Management. The Cottonwood Canyon Wilderness is bordered by the Cottonwood Forest Wilderness to the no
CC0 1.0 (общественное достояние)
Sea ice grows throughout the winter and melts throughout the summer, reaching its maximum extent in late February or March, and its minimum extent in September. The ice that survives at least one summer melt season is typically thicker and more likely to survive future summers. Since the 1980s, the
CC0 1.0 (общественное достояние)
Alaska's Deep-Sea Sponges: Building a Library of Species Nobody Has Named Yet