Автора пока нетВзять себе
- Лицензия
- CC BY-SA 4.0По материалам www.appropedia.org
- Языки
- English

The nearly finished pond, spring 2022. (Photo: Kathy Nativi on Appropedia, CC BY-SA 4.0)
At the Campus Center for Appropriate Technology (CCAT) at Cal Poly Humboldt in Arcata, California, a small aquaponics pond built years earlier by students had fallen apart, neglected through Covid-19, changes of leadership and a lack of funding. In spring 2022, three students in the Engineering 305 class took on its revitalization with CCAT as the client. Their goals: rebuild it smaller, make it educational, and keep it easy to maintain.
The heart of their design is almost nothing: a 20-watt solar panel wired straight to an air pump, with no battery. When the sun shines, the pond is aerated; when it does not, it rests.

The old pond before work began. (Photo: Kathy Nativi on Appropedia, CC BY-SA 4.0)
What the client wanted
CCAT's directors weighed what mattered, from 1 to 10:
| Criterion | Weight | What it meant |
|---|---|---|
| Educational | 10 | sustainable, reused materials, clear signs anyone can follow |
| Documentation | 10 | full records, so later directors can maintain it |
| Safety | 10 | a fence, ideally of recycled material, and safe solar wiring |
| Budget | 10 | stay within it |
| Maintainable | 9 | easy to hand on; the electronics are the fragile part |
| Sustainable | 9 | solar aeration and reused materials |
| Water quality | 8 | aeration to prevent eutrophication; nutrients left to CCAT |
| Accessible | 7 | easy to reach floating plants and to clean |
| Aesthetics | 4 | function over looks |
The build
- Check what is underground. The old pond had been built without records or permission to dig, so the team went through Cal Poly Humboldt's Facilities Management first, to find the electrical, sewage, gas and water lines that might run beneath it. Lines they uncovered were covered in red-dyed concrete to warn anyone who digs there later.
- Dig and shape. The team pulled out the old liner and clay, leveled the bottom and dug a little deeper, without enlarging the pond. A cinder-block and rock wall split off the old pond's smaller section, later filled like a hugelkultur bed with logs, sticks, clippings and soil; with the electrical line directly beneath, the wall could have no rebar.
- Build the berm from the excavated clay, packed tight and sealed with a clay slurry — shaped, for fun, into a snake.
- Layer and line. Clay, then thin layers of gravel and sand under a stiff reinforced polyethylene (RPE) liner, weighed down with sandbags and settled with water; the edges were buried and edged with rocks. An overflow pipe through a notch in the berm drains into a gravel field.
- Fence and power. Fence posts and a pressure-treated 4×4 post were set in concrete; the panel faces south-southwest like CCAT's other panels. The wiring, including a 24-to-12-volt step-down converter, sits in a waterproof box that is locked — a battery had been stolen from CCAT before.

Digging out the old pond. (Photo: Rose on Appropedia, CC BY-SA 4.0)

The dividing wall going up, and the electrical line covered in red-dyed cement. (Photo: Rose on Appropedia, CC BY-SA 4.0)

The layers of the new pond, drawn by Alexa R. (Photo: Rose on Appropedia, CC BY-SA 4.0)

The berm, finished as a clay snake. (Photo: Kathy Nativi on Appropedia, CC BY-SA 4.0)

Settling the liner with sandbags. (Photo: Kathy Nativi on Appropedia, CC BY-SA 4.0)

Mounting the panel. (Photo: Kathy Nativi on Appropedia, CC BY-SA 4.0)
The materials came to $488.12, under the $600 budget, with much of the rest — blocks, rocks, clay, lumber, pipe — reclaimed on site at no cost.
Did it work?
The team first tested a smaller 10-watt, 15-volt panel. On an overcast afternoon it gave only about 9 volts, too little to rely on, so they traded it for the 20-watt, 12-volt panel, which bubbled far harder. A DC monitor on a bright but overcast day read 19.95 volts, 0.27 amps and 5.3 watts — the voltage near the top of its range, the current holding the power down.
Without a dissolved-oxygen kit, they judged by eye. With no sun the water lay still; at roughly a quarter of full sun there was some movement but little at the surface; at half sun and above they judged the aeration enough to keep mosquitoes and eutrophic conditions away, provided nutrients are kept in check. In Arcata they expect 3 to 5 hours of aeration a day. One lesson came quickly: mosquitoes appeared while the water sat still for about a week before the aerator was connected. A larvicide cleared them within 24 hours.

The aerator at work. (Photo: Kathy Nativi on Appropedia, CC BY-SA 4.0)

Measuring the system with a DC energy monitor. (Photo: Kathy Nativi on Appropedia, CC BY-SA 4.0)
Keeping it going
Almost nothing is needed: a glance to see the bubbler working when the sun is out; netting out debris weekly or monthly; keeping the panel clear and the overflow pipe open before the rains; checking the pH — ideally 6.0 to 8.5 — after heavy rain; and a yearly look at the liner, fence, posts and signs. To "switch off" the system, cover the panel with a thick cloth — the team's own verdict was that they should have fitted a switch.
What they would tell the next team
- Get Facilities or Grounds approval first. It takes time, may change where or how you build, and digging near buried utility lines without it is dangerous.
- Chase answers — if emails go unanswered, call — and put agreements in writing.
- Document every step with photos, videos and notes, and plan the footage you will need.
- Plan around the weather, share a visible calendar, and settle roles early.
What could come next: turning the overflow into rainwater catchment, planting the separated section, and floating plants — watercress, which likes cool, clean, slow water, is the directors' candidate. Only time will tell whether the maintenance plan is enough.
Sources
- "CCAT Small Pond Revitalization" from Appropedia, by its contributors (the Spring 2022 team: Rose, Charlesricci1 and Ramirez alexa), under CC BY-SA 4.0. Changed: rewritten in hubnx's own words and condensed; the literature review, weekly timeline and videos left out; each photo under its own licence, credited in its caption. This page is shared under CC BY-SA 4.0.
Комментарии