A water sample for testing (photo: Cheyenne Celada on Appropedia, CC BY-SA 3.0).
A school in La Yuca, a community in Santo Domingo, Dominican Republic, had a rainwater system that was used for cleaning but had problems producing drinkable water. In summer 2012 a team from the Cal Poly Humboldt Dominicana Program set out to improve it, working with Universidad Iberoamericana (UNIBE), RevArk and community members. Their goal was better filtration so the system could supply potable water to the grammar school; the upgrade was estimated to save RD $300 a week, and the system was simplified for easier maintenance. Their report is on Appropedia.
What the design had to do
The team weighted its criteria, giving the most weight to safety (water must be drinkable and the system safe for children to play near) and to low running costs, which had to be below the price of buying the same amount of drinkable water. Next came reproducibility, cost to build (under US$1,000), teaching value and durability against tropical storms. Ease of maintenance, adaptability and looks counted for less.
How a rainwater system works
The report's literature review covers each stage:
- Roof. A smooth metal roof sheds dust and debris, and the sun heating the metal kills some pathogens. Roofs with bitumen should be avoided, and rust should be limited. Zinc from a galvanized steel roof is not enough to harm health.
- Gutter. Too steep a slope spills water, too level a one leaves it standing, which breeds mosquitoes and algae. An end cap keeps out rodents. Lead gutters are never suitable.
- Primary screen. Keeps large debris out so the system does not clog.
- First flush. The first minutes of rain wash dust, droppings and pollutants off the roof, so that water is diverted away from the tank. Recommended diversion is one to two gallons for each 100 square feet of roof.
- Storage. Usually the most expensive part, so size it with the roof area, number of users, consumption, dry spells and local rainfall in mind.
- Filtration and disinfection. A slow sand filter reduces turbidity; a silver-impregnated activated carbon filter removes taste, odors and some organic traces; chlorine can be added, at 2 fluid ounces per 1,000 gallons.
The Dominican Republic averages 150 cm of rain a year, and hurricanes, worst in August and September, can wreck an unstable system.
What they built
| Part | La Yuca's version |
|---|---|
| Catchment | The galvanized steel roof of the school's ecoladrillo classroom, about 175 square feet (16 square meters) |
| Gutter | A 3-inch PVC pipe cut lengthwise and wired to the roof, ending in a 90-degree elbow |
| Primary screen | An upside-down 5-gallon jug (botellón) with chicken wire, a fine screen and a stainless steel drain filter inside |
| First flush | A 3-inch PVC pipe with a ball valve that shuts when it fills, and two 5-gallon jugs with small holes to bleed off dirty water slowly; the jugs are painted to stop algae growth, and joined with connectors so they can be taken apart for checks |
| Storage | A tinaco, the rooftop tank common in the Dominican Republic, raised on cinder blocks for pressure, tied down and weighed with sandbags |
| Overflow | A pipe with a fine screen, to keep mosquitoes from laying eggs |
| Filtration | A sediment filter, then a silver-impregnated carbon filter |

The area of catchment (photo: Cheyenne Celada on Appropedia, CC BY-SA 3.0).

The gutter (photo: Cheyenne Celada on Appropedia, CC BY-SA 3.0).

The primary screen (photo: Cheyenne Celada on Appropedia, CC BY-SA 3.0).

The first flush (photo: Kathy Nativi on Appropedia, CC BY-SA 3.0).

Filtration (photo: Cheyenne Celada on Appropedia, CC BY-SA 3.0).
A "Liter of Light" skylight was also set into the roof, sealed with a patch of scrap metal and silicone. The priciest items on the materials list were the tinaco at 3,800 DOP, the carbon filter at 1,600 DOP and the main length of 3-inch PVC, also 1,600 DOP. The report's total does not match its own itemized list, so it is not repeated here.
Timeline and tips
The project began on June 9, 2012, with measurements of the pipes and tests of the sand filter's flow, and criteria were set within days. The team talked with a community member, tried first flush containers of different sizes, raised the tank for more pressure, fitted the sediment filter to a concrete wall, and received a signed letter from UNIBE asking for free water testing. On July 7, 2012, construction was complete and testing began. Planned tests were biochemical oxygen demand, total suspended solids, E. coli, fecal coliform and total coliform. Whether the water is safe to drink depends on those tests, which the page lists as the next step.
The team's advice for anyone building their own: get to know the place and the people; measure the roof; size the first flush for the roof area; measure the pressure head from gutter to ground; find a tank big enough; protect it from mosquitoes; secure the gutter against the weight of water; raise the tank as high as possible for the filter; and cut the overflow pipe at an angle so one leaf cannot block it.
Sources
- Appropedia, "La Yuca rainwater catchment 2012", by its contributors (https://www.appropedia.org/La_Yuca_rainwater_catchment_2012), under CC BY-SA 4.0; photos credited to their photographers in the captions, under CC BY-SA 3.0. Changed here: summarized and rewritten, the project box, calculations, supporting files and references left out, health claims about roofing materials left out; rewritten in hubnx's own words.