Перейти к содержимому
Hub Nexus

Автора пока нетВзять себе

Версия 3Обновлено 5 мин чтения

Поддержка

On April 4, 1968, the second Saturn V thundered off Launch Pad 39A on a flight that ran into trouble from the start, and NASA still decided against another uncrewed test. Apollo 6, the second uncrewed test of the Moon rocket and Apollo spacecraft, suffered vibration in the first stage that tore loose spacecraft adapter panels, lost two second-stage engines early and failed to restart its third stage. Even so, the capsule returned, and senior managers concluded that another uncrewed test was not necessary: the next Saturn V would carry a crew.

Liftoff of Apollo 6 from Launch Pad 39A

Liftoff of Apollo 6 from Launch Pad 39A (NASA).

The plan

Apollo 6 followed two successful uncrewed tests: Apollo 4, the first all-up flight of the Saturn V and the Command and Service Modules (CSM), and Apollo 5, the first orbital test of the Lunar Module (LM). The plan was for the first three stages to put the CSM, still attached to the third stage, into a 115-mile-high circular orbit. After two orbits to check all systems, the third stage would restart for more than five minutes to simulate the burn that sends a spacecraft toward the Moon, producing a highly elliptical orbit with a high point of about 320,000 miles.

Three minutes later the CSM would separate and the Service Module engine would fire for about four minutes to slow the spacecraft, simulating a direct-return abort and lowering the high point to about 14,000 miles. On the way back it would fire again for about three minutes to raise reentry speed to about 25,000 miles per hour, simulating a return from the Moon. The flight would end with a Pacific splashdown after just under 10 hours.

Building the rocket

Assembly in the Vehicle Assembly Building at NASA's Kennedy Space Center began with the third stage on February 21, 1967, followed by the first stage on March 13. The second stage arrived two months late, on May 24, and had to be checked for cracks in its hydrogen tank, so workers first stacked a spool-shaped spacer in its place for fit tests on March 29 and swapped in the real stage on July 13. For the first time two Saturn V rockets were processed at once, with Apollo 4 taking priority and often delaying Apollo 6.

The spacecraft included no Lunar Module. A Lunar Module Test Article, LTA-2R, which arrived on February 14, 1967, sat inside the adapter above the third stage to roughly match the mass and dynamics of a real module, fitted with sensors to record vibration and acceleration. The Command and Service Modules arrived on September 29, were stacked with the test article and trucked to the Vehicle Assembly Building, and were mounted on the rocket on December 10. The rocket rolled out on February 6, 1968, a three-mile trip to Pad 39A, delayed two hours by weather. The Flight Readiness Test was done on March 8, the review three days later and the weeklong countdown rehearsal on March 31. Newly sworn-in NASA Deputy Administrator Thomas O. Paine and the directors of the major field centers watched the countdown and launch.

What went wrong

Two minutes into the flight, the first stage shook for about 30 seconds in vertical oscillations called the pogo effect. They loosened about 27 square feet of the adapter's outer panels and would have been very uncomfortable for astronauts. In the second stage, two of five engines shut down early. The other three burned longer to compensate, as did the third stage, which reached an elliptical orbit of 108 by 222 miles rather than the planned circle. When it was time to restart, the third stage did not. It still performed its turnaround maneuver as if the burn had happened.

The adapter panels damaged by excessive vibration during first-stage flight

Excessive vibration during first-stage flight visibly damaged the external panels of the spacecraft's adapter (NASA).

In Mission Control, the team under Flight Director Clifford E. Charlesworth carried out a planned alternate mission. They separated the spacecraft from the third stage and used the Service Module engine for a burn of 7 minutes 21 seconds to reach the 14,000-mile altitude. That used so much fuel that the second burn to lunar return speed was impossible, and reentry came at 22,380 miles per hour, somewhat below plan.

Splashdown and recovery

After a normal parachute descent, Apollo 6 splashed down in the Pacific north of Hawaii after 9 hours 57 minutes, 56 miles from the prime recovery ship, the helicopter carrier U.S.S. Okinawa. Recovery forces found the capsule 26 minutes later, helicopters dropped Navy swimmers to fit flotation collars, and sailors hoisted it aboard about six hours after splashdown. The Navy returned the capsule to its builder in Downey, California, and it is now displayed at the Fernbank Science Center in Atlanta. The stranded third stage, which never reached solar orbit, burned up on reentry on April 26, 1968.

Pictures from a faulty flight

Apollo 6 still produced remarkable images. The first and second stages carried recoverable camera pods. Of four first-stage cameras, three failed to eject, and the U.S.S. Austin recovered the fourth. Two pods in the second stage recorded the first-stage separation, footage that has become iconic of Saturn V launches and is often wrongly credited to Apollo 11. The Austin found only one pod, since the other's locator beacon failed.

A camera inside the second stage capturing the separation of the first stage

A recoverable camera in the second stage captures the Saturn V's first stage separating (NASA).

Over its two orbits, the spacecraft's 70-millimeter window-mounted camera took color stereo photographs. Scientists found them suitable for cartographic, topographic and geographic studies of continents, coasts and shallow waters. The film and filter combination was better in color balance and resolution than any photographs from the Mercury and Gemini flights, and the camera covered parts of the United States, the Atlantic, Africa and the western Pacific.

A flight in the shadow of the news

Apollo 6 got less press attention than usual. Four days before launch, President Lyndon B. Johnson announced he would not seek reelection in November 1968, and about an hour after splashdown the civil rights leader Rev. Martin Luther King was assassinated in Memphis, Tennessee. Within NASA, the focus stayed on President Kennedy's goal of landing a man on the Moon before the decade's end. After analyzing the rocket's imperfect performance, engineers at the Marshall Space Flight Center in Huntsville, Alabama, and senior managers decided they could solve the pogo problem and the engine failures, and that no more unmanned tests were needed. The next Saturn V would carry a crew, and it would be more than just the first crewed flight of the Moon rocket.

Sources

Комментарии

Spinner Logo

Ещё на тему «Наука»

Автор: Hub Nexus editors
Top 10 in AI, week of 2 November 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 26 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 19 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 12 October 2026
CC0 1.0 (общественное достояние)
Help NASA Design a Robot to Dig on the Moon
CC BY 4.0
Adaptive Evolution