Apollo 9 lifted off on March 3, 1969, carrying the first crew to fly the Lunar Module, the craft that was supposed to land astronauts on the Moon. A NASA history page follows its launch and first two days in orbit.

The Apollo 9 crew, left to right, McDivitt, Scott and Schweickart, in front of their Saturn V at Launch Pad 39A. Image from NASA's page.
Liftoff
At 11:00 AM EST on March 3, 1969, the five F-1 engines of the 363-foot Saturn V, together producing 7.5 million pounds of thrust, lifted it off Launch Pad 39A at Kennedy Space Center. It was only the second time the giant rocket carried astronauts, another step toward President Kennedy's goal of landing on the Moon and returning safely before the end of the decade. The crew was Commander James A. McDivitt, Command Module Pilot David R. Scott and Lunar Module Pilot Russell L. Schweickart. Their 10-day mission in Earth orbit was to test the Lunar Module (LM). The rocket's three stages placed the spacecraft, still attached to the S-IVB third stage, in a precise orbit just over 11 minutes after liftoff. At 95,231 pounds, Apollo 9 was the heaviest crewed spacecraft put into Earth orbit up to that time. For communication when the two craft flew apart, the crew named the command module Gumdrop and the lunar module Spider, after their appearance.

Apollo 9 crew patch. Image from NASA's page.

Launch of Apollo 9. Image from NASA's page.
Launch controllers watched from Firing Room 2 of the Launch Control Center, with the Vice President and NASA's acting administrator among the guests. Once the rocket cleared the tower, control passed to Mission Control at the Manned Spacecraft Center, now Johnson Space Center, in Houston, where three teams of controllers worked eight-hour shifts until splashdown.

Controllers and managers monitor the Apollo 9 launch from Mission Control in Houston. Image from NASA's page.
Docking with the S-IVB
Less than two hours in, on the second trip around Earth, the crew extended Gumdrop's docking probe. Two hours and 41 minutes after launch, the Command and Service Module separated from the S-IVB and pulled away, and the four panels of the Spacecraft LM Adapter that protected the lunar module during launch were jettisoned. McDivitt turned Gumdrop around to face Spider, still attached to the S-IVB, and closed the gap slowly to dock. About an hour later springs ejected the docked pair from the S-IVB. Controllers restarted the S-IVB's engine twice over the next few hours to simulate the burn that would send a spacecraft toward the Moon, then sent the spent stage into solar orbit.

LM Spider still attached to the S-IVB stage, just before transposition and docking. Image from NASA's page.

The S-IVB stage after separation from the docked spacecraft, with LM thrusters and antennas in the foreground. Image from NASA's page.
The first days
The crew pressurized the tunnel between Gumdrop and Spider, removed the command module's hatch, connected cables to power the lunar module while docked and replaced the hatch. The first of eight planned burns of the Service Propulsion System engine, a five-second firing, raised the orbit for better lighting at the rendezvous later in the mission and showed that the docking mechanism and the LM were sturdy enough to take the big engine's firing. All three crewmembers slept at the same time that night, the first time in the Apollo program; on earlier missions at least one crewman stayed awake to monitor the spacecraft.
The next day three more burns, of different lengths, tested the control of the docked vehicles with the digital autopilot, adjusted the orbit for lighting and cut the Service Module's weight to save fuel for later firings and the deorbit burn. The second maneuver, nearly two minutes long, raised the orbit slightly; the third, of more than four and a half minutes, raised it again; and the fourth, 28 seconds long, adjusted the plane of the orbit. Mission Control considered all three successful. The crew then began a second sleep period before the next day, when they were to enter Spider for the first time.
Sources