In April 1980 the first Space Shuttle still needed 7,000 of its 31,000 heat-shield tiles. NASA hoped to fly STS-1, Columbia's first flight, by November 1980, though even senior managers agreed the date could slip into early 1981. A NASA history account looks at where the most complex human spaceflight system ever designed stood that month.

The hardware at Kennedy

Prime crew John W. Young and Robert L. Crippen, with backups Richard H. Truly and Joe H. Engle, trained for the mission, and flight controllers at the Johnson Space Center in Houston ran simulations. At the Kennedy Space Center, all the major components had arrived.

The two solid rocket boosters for STS-1 stacked on the mobile launch platform in the Vehicle Assembly Building.

The two solid rocket boosters for STS-1, stacked on the mobile launch platform in the Vehicle Assembly Building.

  • Solid rocket boosters. Segments from Thiokol in Brigham City, Utah, began arriving in 1979, and workers stacked them in January 1980.
  • External tank. It arrived by barge from the Michoud Assembly Facility in New Orleans in July 1979 and was in test in the Vehicle Assembly Building, awaiting mating to the boosters.
  • Orbiter Columbia. It arrived in March 1979. Its main pacing item for the planned launch was the Thermal Protection System, the heat-resistant tiles. Hundreds of technicians applied them and tested their adhesive strength by pulling on them.

The orbiter Columbia undergoing testing in the Orbiter Processing Facility.

Columbia undergoing testing in the Orbiter Processing Facility.

A technician at Kennedy applying a heat-shield tile to Columbia.

A technician applying a tile to Columbia in the Orbiter Processing Facility.

Engines that went back to the test stand

The three main engines were the most sophisticated and efficient rocket engines built up to that time. Burning liquid hydrogen and liquid oxygen from the external tank, each gave 375,000 pounds of thrust at liftoff and 470,000 in vacuum. Columbia's three had passed certification and been installed in 1979, but unrelated testing showed modifications were needed. Workers removed them and sent them in June 1980 to the National Space Transportation Laboratory in Mississippi, now Stennis Space Center, for more full-duration tests.

At the same site, certification continued with single-engine and three-engine cluster tests on a test article built from an aft shuttle fuselage and an engine structure. Full-duration tests on March 20 and 31 included gimballing the engines and raising thrust to 109%. A cluster test on April 16 was shut down automatically after five seconds because a component overheated, and was repeated later. Two orbital maneuvering system pods, which handle orbital corrections including the reentry burn, were installed on Columbia in March 1980.

A single main engine firing at the National Space Transportation Laboratory.

A single main engine test at the National Space Transportation Laboratory.

Rehearsing the rest

  • Booster recovery. The boosters give 2.8 million pounds of thrust at ignition and splash down by parachute about two minutes after liftoff. Sailors practiced recovering them with a high-fidelity mockup, the Ocean Test Fixture, which arrived at Port Canaveral in March; full-scale rehearsals were held in April and May.
  • Pad escape. In an emergency in the final minutes of countdown, crew and support staff at the orbiter access arm of Pad 39A would climb into one of five flat-bottomed baskets, each for 2 to 3 people, and slide down a 1,200-foot cable. In March tests, without people aboard, the average time from leaving the orbiter to reaching the ground was 19 seconds.
  • Ejection seats. For its first four flights Columbia carried ejection seats for the two pilots, good up to 80,000 feet, after which they would parachute into the Atlantic and wait in life rafts. On April 16 the prime and backup crews took an abbreviated water-survival course at Homestead Air Force Base in Florida, wearing high-altitude pressure suits like those they would fly in.
  • Mission Control. From April 22 to 24, flight controllers, trainers and astronauts ran a 54-hour full-duration simulation from simulated launch to landing. Nearly 500 people took part, and the backup crew "flew" Columbia in the simulator while trainers introduced anomalies. One of the flight directors said that if teams could overcome similar problems in a real flight, the flight could be called a success. Several more such simulations followed before the actual STS-1 in April 1981.

Sources

Комментарии

Spinner Logo

Ещё на тему «Наука»

Автор: Hub Nexus editors
Top 10 in AI, week of 19 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 12 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 2 November 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 26 October 2026
CC0 1.0 (общественное достояние)
Infections can lead to sepsis. Four ways to cut your risk — prevent infections, keep clean, know the signs, act fast — plus extra steps for people with cancer, whose treatment weakens the body's defenses.
CC0 1.0 (общественное достояние)
The STAMBP gene provides instructions for making a protein called STAM binding protein. Learn about this gene and related health conditions.