NIST's investigation of the 2021 failure of the Champlain Towers South building in Surfside, Florida, is reinforcing its preliminary finding that the failure likely started in the pool deck rather than in the tower itself. Recent interviews and analyses of test results and physical evidence support that conclusion, and the investigation has also identified indications of the building's distress that were visible in the weeks before the partial collapse. This page reports the update as the National Institute of Standards and Technology (NIST) gave it at a virtual meeting of the National Construction Safety Team (NCST) Advisory Committee on September 9.
Where the failure likely started
The investigation's lead and co-lead summarized the team's activities and its preliminary findings from earlier updates, including an extensive video released in June 2025, and highlighted significant progress in the failure analysis since that update. The co-lead described the team's efforts to advance its evaluations of potential failure initiation scenarios through computer simulations, supported by the results of large-scale structural testing and by evidence of the building's distress in the weeks before the failure. The team has also been refining its analysis of the effects of steel reinforcement corrosion, concrete shrinkage and improperly built construction joints in the pool deck slab.
The results of these efforts, the co-lead said, indicate that it is more likely that the failure started in a pool deck slab-column connection. Large-scale structural testing and computer analyses of video footage captured at the time of the collapse also shed light on how the collapse progressed from the pool deck into and through the tower.
Signs of distress before the collapse
| Sign | Where |
|---|---|
| A sliding glass door that came off its frame | The pool deck and street-level parking deck |
| The previously reported horizontal crack in a planter wall, and distress where the wall meets a planter box | The same small area |
| A gate that shifted vertically and jammed so that it could not be opened | The same small area |
| Water leaking from the garage ceiling the day before the collapse, in an area with many cracks and repairs over the years; the flow dramatically increased in the hours before the collapse | The garage |
All of the first three issues were concentrated in a small area of the pool deck and street-level parking deck, which has been confirmed to have begun collapsing at least seven minutes before the tower.
What comes next
The team is focused on completing its technical work by the end of 2025 and drafting its reports, which will include a summary report and six subject-focused technical reports. It is engaging stakeholder groups in building design, construction, inspection, evaluation and maintenance to share preliminary analysis results and gather information that will inform technical and policy recommendations, so that the findings bring improvements to building safety, both for new construction and for the ongoing integrity of existing buildings. “This tragic event has revealed flaws in our systems, and quality is at the heart of it,” the investigation's lead said. The team planned its next detailed public update for Spring 2026.