Автора пока нетВзять себе
- Лицензия
- CC0 1.0 (общественное достояние)По материалам www.nps.gov
- Языки
- English
A Park Service case study of the federal historic tax credit describes how the 1931 Cheney High School in Cheney, Washington became School House Lofts, student housing near Eastern Washington University.
Project profile
| Historic name | Cheney High School |
| Current name | School House Lofts |
| Year built | 1931 |
| Original use | Public high school |
| Rehabilitation completed | 2017 |
| New use | Student housing |
| Total project cost | $8,000,000 |
| Federal historic tax credits (20%) | $1,372,000 |
| Also used | Washington State's Special Valuation for Historic Properties Program |
History
The three-story brick and terra-cotta building was designed by Spokane architect George Rasque in the Collegiate Gothic style and is a contributing structure in the Central Cheney Historic District on the National Register of Historic Places. It was a high school until 1967, when a new senior high opened, then the junior high for eight years, and then the school district's administrative offices until 2013.
The rehabilitation
The district tried to sell the building from 2013 and found no buyer for nearly three years. In 2016 a development partnership bought it for conversion to student housing. The team turned the historic gymnasium and auditorium, spaces many developers would see as unusable, into assets: it kept one half of each two-story space open as communal areas and built loft apartments in the other half. One shared space became a study lounge and game room and the other holds kitchen and laundry facilities.
The 56,000-square-foot building sits at the end of the university campus and had to meet the Secretary of the Interior's Standards for Rehabilitation, which posed architectural and financial challenges. The developer worked closely with the state historic preservation office. To keep the high-school feel, much of the interior stayed intact:
- Sleeping lofts with study nooks were built over closets and bathrooms to use the 12-foot ceilings.
- Mahogany wainscoting, trim and chalkboards were kept or reused, and salvaged gymnasium flooring was reused elsewhere.
- The original eight-foot steel-sash windows were restored, and the wide hallways, lockers and terrazzo floors stayed.
The result is 36 residential units with 118 beds, in studio and two-, three- and four-bedroom layouts.
Tax incentives and impact
Besides the federal credit, the project used Washington's special valuation program, run by the City of Cheney, under which taxes for ten years exclude major improvements and rises in assessed value. The case study says that, given the cost and complexity, the project would not have gone ahead, and spaces like the gym and auditorium would not have been preserved, without the federal credit.
It also says the project provides much-needed student housing, reduces car use and eases campus parking because of its closeness, and blends a large historic building into a residential part of Cheney.
Uses of funds
| Use | Amount |
|---|---|
| Acquisition | $750,000 |
| Construction | $6,340,000 |
| Soft costs | $630,000 |
| Furniture, fixtures and equipment | $280,000 |
| Total | $8,000,000 |
The source's table of funding sources does not add up to the total, so it is left out.
Sources
- National Park Service, Technical Preservation Services, "Case Study: Cheney High School, Cheyney, Washington" (https://www.nps.gov/articles/cheney-high-school.htm); the developer's photographs and names are left out; rewritten in hubnx's own words.