Перейти к содержимому
Hub Nexus

Автора пока нетВзять себе

Версия 2Обновлено 3 мин чтения

Поддержка

For 20 seconds in February 1981 the three main engines of space shuttle Columbia roared on Launch Pad 39A, the first rocket ignition at that pad since the Apollo-Soyuz Test Project liftoff in 1975. The Flight Readiness Firing (FRF), watched by both STS-1 astronauts from separate aircraft overhead, was one of the milestones that gave NASA confidence in an April 1981 first launch, as told in NASA's history page for the two-month mark.

Space shuttle Columbia on Launch Pad 39A with the full Moon behind it

Sunrise at the Kennedy Space Center with Columbia on Launch Pad 39A

Left: Columbia awaits the Flight Readiness Firing at Launch Pad 39A at Kennedy Space Center, with the full Moon behind it. Right: sunrise at Kennedy with Columbia on the pad. Images from NASA's page.

The run-up

The month brought three milestones. Teams at Kennedy Space Center (KSC) in Florida and Johnson Space Center (JSC) in Houston finished the wet countdown demonstration test and the FRF. The Mission Control Center at JSC finished the seventh and last full-duration simulation of the mission. And the STS-1 crew, John W. Young and Robert L. Crippen, kept training, including shuttle landing practice at an alternate site in New Mexico.

The FRF had been cleared by a static test firing of a cluster of three main engines on January 17, 1981 at NASA's National Space Testing Laboratories in Bay St. Louis, Mississippi. The wet countdown demonstration began the evening of February 16, at T-53 hours, with controllers in Firing Room 1 at KSC, led by STS-1 Launch Director George F. Page, and engineers at JSC following every step. Several delays, which NASA attributed to the learning process rather than any significant problem with the vehicle or ground systems, pushed the FRF back one day to February 20.

Controllers in Firing Room 1 at Kennedy monitoring the wet countdown demonstration test

Four men in Firing Room 1 monitoring the progress of the wet countdown demonstration test

Controllers in Firing Room 1 during the wet countdown demonstration test. Images from NASA's page.

Twenty seconds on the pad

At T-5 hours, engineers began loading the external tank with 225,000 pounds of liquid hydrogen and 1.4 million pounds of liquid oxygen. At T-9 minutes, the ground launch sequencer computer took control of the final steps. At T-3.8 seconds the engines started, one every 120 milliseconds, quickly reaching 100 percent thrust. To mimic a real launch, the computer swiveled each engine and cut thrust to 94 percent for one second before returning to full power. After 20 seconds the sequencer shut all three down.

Young, watching from the air, remarked that it looked successful. Acting NASA Administrator Alan M. Lovelace called it a superb test, and KSC Director Richard G. Smith compared it to "the final playoff game before the Super Bowl".

Columbia during the Flight Readiness Firing, first view

Columbia during the Flight Readiness Firing, second view

Columbia during the Flight Readiness Firing, third view

Three views of Columbia during the 20-second Flight Readiness Firing. Images from NASA's page.

Simulations and a backup landing site

At JSC, controllers in the Mission Control Center ran the seventh and final full-duration 54-hour simulation of the STS-1 mission on February 24 to 26. Three teams under three flight directors followed the flight plan while the simulation team introduced anomalies. Young and Crippen sat in the fixed-base Shuttle Mission Simulator and responded successfully to every one.

In case weather at the prime landing site, Edwards Air Force Base in California, forced a diversion, they also practiced approaches and landings at the Northrup Strip in New Mexico, now White Sands Space Harbor. They flew the Shuttle Training Aircraft, a heavily modified Grumman Gulfstream II built to respond like a descending orbiter.

The space shuttle fixed-base simulator at Johnson Space Center

Astronauts John W. Young and Robert L. Crippen practicing landings in a Shuttle Training Aircraft at Northrup Strip, New Mexico

Left: the fixed-base simulator at JSC. Right: Young and Crippen practicing landings in the Shuttle Training Aircraft at Northrup Strip. Images from NASA's page.

Sources

Комментарии

Spinner Logo

Ещё на тему «Наука»

Автор: Hub Nexus editors
Top 10 in AI, week of 2 November 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 26 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 19 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 12 October 2026
CC0 1.0 (общественное достояние)
From a Networking Event to a Seed Study: Tracking Eelgrass Flowers in Barnegat Bay
CC0 1.0 (общественное достояние)
Achromatopsia