Автора пока нетВзять себе
- Лицензия
- CC0 1.0 (общественное достояние)По материалам www.nps.gov
- Языки
- English
- Издания
- Grand Canyon National Park
How does Grand Canyon National Park get water to its visitors and residents? Through the Trans-Canyon Waterline, which the park highlighted during Engineers Week in February 2021 as it planned a replacement. This page is a look back at that proposal, as of the source.

The Trans-Canyon Waterline beneath a trail bridge near Phantom Ranch. NPS photo.
How the line works
Built between 1965 and 1970, the waterline is the backbone of the park's water system. It runs from the intake at Roaring Springs on the north side of the canyon, down to Phantom Ranch and back up to Indian Garden, through terrain reachable only by trail or helicopter. It serves over 5,000,000 visitors and 2,500 residents at the Inner Canyon Corridor and South Rim developed area.
Gravity does much of the work. Water starts at 5,200 feet elevation, runs down the North Kaibab Trail through Phantom Ranch, crosses the Colorado River at its lowest point of 2,400 feet, at nearly 700 psi under normal operation, then climbs to the Indian Garden pump houses at 3,700 feet. From there it is pumped up 3,300 feet to the South Rim.
Why replace it
At more than 50 years old, the line has outlived its 30-year design life, and breaks are frequent: over several years the park has answered a break at least monthly on average, at about $25,000 per repair. A typical break cuts water flow to the South Rim for three to five days and forces conservation by visitors, residents and concessioners. Inner Canyon facilities north of Phantom Ranch have no drinking water, and Phantom Ranch, Indian Garden and the South Rim then rely on storage: 15,000 gallons at Phantom Ranch and 14 million gallons on the South Rim, about two weeks of use.

Workers repairing the waterline on the North Kaibab Trail. NPS photo.
In March and April 2018, four consecutive breaks plus pump failures forced severe water restrictions for nearly four weeks over the busy spring break, affecting over 17,000 visitors a day. Repairs for the line, pump and helicopter support exceeded $200,000.

Water spraying from a break along the North Kaibab Trail. NPS photo.
The proposal
After studying options with private-sector experts, the Park Service proposed moving the intake to the canyon bottom at Phantom Ranch. Natural flow would return to Bright Angel Creek from Roaring Springs to Phantom Ranch, where an intake would draw from the creek and pump the water to Indian Garden, with pumping to the South Rim unchanged. Phantom Ranch would get a small treatment facility, and a 2-inch drinking-water line about 2.3 miles long from the Roaring Springs pump house would still serve Cottonwood Campground. The new pipeline from Phantom Ranch to Indian Garden would run nearly three miles. The park said this would make supply less vulnerable, far more reliable and consistent in quality, and expected design to finish in early 2022, with construction starting by that fall.
Sources
- National Park Service, Grand Canyon National Park, "Grand Canyon National Park Features Trans-Canyon Waterline to Celebrate Engineers Week 2021" (https://www.nps.gov/articles/000/grand-canyon-national-park-features-trans-canyon-waterline-to-celebrate-engineers-week-2021.htm); a per-year water volume that has no stated time unit is left out; rewritten in hubnx's own words.
Получайте каждую новую страницу:
Grand Canyon National Park
Подписка — это одно письмо, когда добавляется страница, и ничего, когда страница меняется.
Комментарии

Читать дальше
Следующая в издании «Grand Canyon National Park»





