PacifiCorp (doing business as Pacific Power/Rocky Mountain Power) runs the High Plains and McFadden Ridge I wind energy project in Carbon and Albany Counties, Wyoming: 85 wind turbines and their roads, transmission lines and other infrastructure. The project has operated since January 2009 and is expected to last at least 30 years. Monitoring there since 2009 has documented bald and golden eagle deaths, and on January 16, 2020 the company asked the U.S. Fish and Wildlife Service (the Service) for the maximum permit, 30 years.
Why the project needs a permit
The Bald and Golden Eagle Protection Act (the Eagle Act) prohibits take of eagles, including killing them. The Service has been delegated the authority to issue eagle take permits where the take is compatible with the preservation of eagles. It issues them only after an applicant has committed to all practical measures to avoid and minimize the take and to mitigate the anticipated take to the maximum extent achievable.
The company's application is for an incidental eagle take permit, under the Eagle Act regulations of 2016. It came with an Eagle Conservation Plan, which summarizes the project's design, construction and operating measures to avoid and minimize harm to eagles, along with the results of monitoring before and after construction.
What the Service's model predicts
The Service completed a draft environmental assessment that weighs two choices: issuing the permit, or a "No Action" alternative of not issuing one. It looks at the effects of each on the human and natural environment. The Service's Collision Risk Model predicts that operating the project could kill, incidentally, up to 2.5 bald eagles and up to 2.8 golden eagles in a year. For this project the Service did not have enough eagle-use data from before construction to update the model's exposure estimate, so it used the national prior for the eagle exposure parameter.
Review before any decision
Under the National Environmental Policy Act (NEPA), the Service has an independent statutory responsibility to evaluate its own actions, here the possible issuance of the permit. The draft assessment was made available for a 30-day public comment period. All comments were to be evaluated, and no decision on the permit would be made until the NEPA process was complete. This copy of the page reports no decision.
Documents on the page
The page lists the draft environmental assessment, the Eagle Conservation Plan and its appendices, and an intra-Service Section 7 biological evaluation form for Region 7. The appendices cover pre-construction monitoring studies, post-construction mortality monitoring studies, raptor nest studies, and a wildlife incident report and handling system. The company's conservation plan is included for public reference only.
Sources
- U.S. Fish and Wildlife Service, High Plains/McFadden Ridge Wind Energy Project; rewritten in hubnx's own words.