In dry country a flash flood can come and go between a hydrologist's visits, and the standard gage records only the highest water. A U.S. Geological Survey fact sheet explains how adding a pressure transducer to New Mexico's crest-stage gages turns a single peak reading into a timed record of each flood.
The problem
Most streamflow data from ephemeral streams in the desert Southwest come from a traditional crest-stage gage (CSG). It measures only the peak stage of the highest event since the previous site visit, so documentation of the stream is incomplete. Those data feed flood-frequency analysis, which designers of bridges, culverts, dams, levees and channels need, and more data make for better analysis. In 2002 the USGS, in cooperation with the New Mexico Department of Transportation, began installing submersible pressure transducers at CSG sites. Since 2002, 35 of the 80 CSGs in New Mexico have become automated crest-stage gages (ACSGs).
How the two gages work
A CSG is a 2-inch-diameter steel casing with intake holes in the bottom cap and a vent hole in the top cap. A wooden lath sits inside and shredded cork in the bottom cap. As water enters, the cork floats; as it recedes, bits of cork stick to the lath in a line at the highest level, and field staff read the peak stage at the next visit.
An ACSG is a self-contained data-logging pressure transducer installed in the CSG pipe. During a flood it measures the pressure of the water column, from which peak stage is worked out, and logs the stage and time throughout the event.

Figure 2 of the sheet: the casing, with a transducer attached to the lath and secured with nylon ties.
Two kinds of transducer have been used. A differential-pressure transducer corrects for barometric pressure and needs a vent tube, which cannot be submerged, so it must be installed above the highest possible flood. An absolute-pressure transducer is fully enclosed, so submergence is no concern; it works as a barometer before and during an event, letting barometric pressure be factored out, and measures depth up to 69 feet. Only absolute-pressure transducers are now used in New Mexico. They record at a user-selected interval, activate 0.15 foot after submergence begins, keep recording while the level rises or falls by 0.15 foot, and log every 8.25 hours when nothing flows.

Figure 3 of the sheet: a differential-pressure transducer.

Figure 4 of the sheet: one event at Yeso Creek near Fort Sumner on July 3, 2002, with a main peak and a smaller one.
A CSG stays at each ACSG site so the transducer's peak can be checked against the cork line, which is accurate to 0.01 foot, and as a backup; since 2002 no transducer has failed. A transducer stores 1 megabyte, so a site could be visited once a year, though a year's data could be lost if the transducer fails, is damaged in a flood or is vandalized.
Trade-offs
| Traditional CSG | Automated CSG | |
|---|---|---|
| Cost | Inexpensive | More expensive |
| Toughness | Rugged enough for flash floods | Same housing; a vented transducer's cable cannot be submerged more than 30 minutes |
| What it records | Peak stage of the highest event only, with no date, time or continuous stage | Date, time and continuous stage for each event, and how many events came between visits |
| Other | A later, higher peak can be missed if sediment covers the cork | Needs no field calibration and fewer site visits; starts recording when water arrives |
How well they agree
The sheet compares cork-line peaks with transducer peaks at 5-minute recording intervals; the differences ranged from +0.07 to -0.42 foot over 16 storms. Most are within acceptable limits for ephemeral streams. Larger gaps, such as -0.42 foot at Burro Canyon near Lindrith, suggest the 5-minute interval was too long, and storm intensity matters most, with basin size, shape and area also playing a part, so an interval under 5 minutes may be needed to catch the peak.
| Station | Traditional stage (ft) | Automated stage (ft) | Difference (ft) |
|---|---|---|---|
| Raton Creek at Raton | 1.08 | 0.83 | -0.25 |
| Sand Draw near Clayton | 4.57 | 4.48 | -0.09 |
| Running Water Draw near Clovis | 2.72 | 2.76 | +0.04 |
| San Cristobal Arroyo near Galisteo (four storms) | 1.72, 1.94, 1.03, 1.12 | 1.73, 1.94, 0.91, 1.03 | +0.01, +0.00, -0.12, -0.09 |
| San Pedro Creek near Golden | 1.28 | 1.01 | -0.27 |
| Tecolote Creek at Tecolote | 1.92 | 1.71 | -0.21 |
| Yeso Creek near Fort Sumner (three storms) | 5.14, 4.40, 3.57 | 5.10, 4.47, 3.52 | -0.04, +0.07, -0.02 |
| Big Draw near Mountainair | 2.35 | 2.33 | -0.02 |
| Gobernador Canyon near Gobernador | 1.24 | 0.95 | -0.29 |
| Burro Canyon near Lindrith | 1.92 | 1.50 | -0.42 |
| Galestena Canyon tributary near Black Rock | 0.59 | 0.64 | +0.05 |
The original fact sheet is below.
Sources
- U.S. Geological Survey, fact sheet "Automated Crest-Stage Gage Application in Ephemeral Streams in New Mexico" (https://pubs.usgs.gov/publication/fs20053136), public domain as a work of the United States government; the sheet gives the number of comparison sites two ways, so that count is left out, and the table is read from the PDF; contact details and references are left out; rewritten in hubnx's own words.