Автора пока нетВзять себе
- Лицензия
- CC0 1.0 (общественное достояние)По материалам science.nasa.gov
- Языки
- English
- Темы
- Наука
On Hubble's final servicing mission, astronaut Michael Massimino stripped the last of four screws holding a handrail to the Space Telescope Imaging Spectrograph (STIS), and for about four hours nothing worked. If the handrail stayed on, 111 screws on the panel could not come off, and the instrument's power supply could not be swapped. NASA's Goddard Space Flight Center tells how the crew got past it, and how the mission made Hubble better than before.

A window on Atlantis frames Hubble as astronaut Megan McArthur uses the shuttle's robot arm to grab the telescope. Hubble orbits about 340 miles above Earth (NASA).
The stuck screw
Massimino and Michael Good were replacing the STIS power supply, which was not designed to be replaced, so the crew had practiced for months with hundreds of carefully made tools. Massimino took out three screws easily; the fourth stripped under his power tool. The rest of the crew and engineers on the ground, at NASA's Johnson Space Center, tried to find a solution while he swapped bits to no avail. Finally a team at Goddard came up with a workaround: rip the handle off, without letting sharp edges puncture the suit and, if possible, catching loose pieces. Massimino pulled and the handle broke free. The delay lasted hours, and the mission went on.

During the fourth spacewalk a stripped screw delayed removal of a handrail on STIS. After nearly four hours, Good, Massimino, the crew and a team on the ground found a way to remove it (NASA).
How the mission came to be
After the space shuttle Columbia was lost in 2003, NASA Administrator Sean O'Keefe canceled shuttle missions not going to the International Space Station, including the last trip to Hubble. Three of the six gyroscopes had failed, STIS failed in 2004, and at one point Hubble could not do science for about a month. Frank Cepollina, who is credited with the first plans to service an orbiting satellite, worked on doing it all with robots. On Oct. 31, 2006, Michael Griffin, O'Keefe's successor, announced a shuttle would return after all, with a backup shuttle and crew ready to launch from Kennedy Space Center to rescue the crew if theirs was damaged at liftoff.
When the Advanced Camera for Surveys also failed, Cepollina's team chose to have astronauts open panels and work on existing instruments rather than build new ones that cost hundreds of millions of dollars. He called it in-orbit surgery with newly sophisticated tools. A further delay came before the planned October 2008 launch, when the unit that runs the instruments and formats their data, the Science Instrument Control and Data Handling (SIC&DH) unit, malfunctioned. Engineers assembled a flight spare from backup parts designed in the 1980s in about six months.
What the crew did
Atlantis launched on May 11, 2009, with seven astronauts, for a 14-day mission.
| Spacewalk | Work |
|---|---|
| First (May 14, 2009) | John Grunsfeld and Andrew Feustel replaced the SIC&DH and swapped Wide Field and Planetary Camera 2 for the more advanced Wide Field Camera 3 |
| Second | Massimino and Good installed new nickel-hydrogen batteries and replaced the rate sensor units, each with two faulty gyroscopes |
| Third | Feustel and Grunsfeld repaired the Advanced Camera for Surveys |
| Fourth | Massimino and Good repaired STIS, after the handrail delay |
| Final | Grunsfeld and Feustel replaced a battery pack and a fine guidance sensor, and three thermal blankets |

Feustel handling the old camera that he and Grunsfeld replaced with the Wide Field Camera 3 (NASA).
Hubble afterward
Scientists expected roughly five serviceable years after the mission, as was typical, and the telescope has already doubled that. Wide Field Camera 3 was the first to glimpse the Kuiper Belt object Ultima Thule, helping scientists decide New Horizons could reach it, and found two of Pluto's small moons before New Horizons arrived. Since the mission, NASA says, Hubble has made over 1.4 million observations. Hubble's senior program scientist Jennifer Wiseman said the telescope is in great shape and the results are what had been hoped for, and chief systems engineer Larry Dunham said it still has full redundancy in its critical systems.
Sources
- NASA, Jennifer Leman, NASA Goddard Space Flight Center, 10 Years Ago, Hubble's Final Servicing Mission Made It Better Than Ever; quoted astronauts and engineers paraphrased; two pictures credited partly to other bodies (JHUAPL, SwRI, ESA) are left out; rewritten in hubnx's own words.
Комментарии




