Автора пока нетВзять себе
- Лицензия
- CC0 1.0 (общественное достояние)По материалам pubs.usgs.gov
- Языки
- English
How do you prove that one barnyard is polluting a stream? Put a water sampler above it and another below it, and compare what a storm carries past each. That is the approach of a U.S. Geological Survey fact sheet, from a cooperative effort with the Wisconsin Department of Natural Resources, which reports pre-improvement monitoring at two barnyards, one on Otter Creek and one on Halfway Prairie Creek. Before the barnyards were fixed, the downstream water was significantly worse on three measures.
The program behind it
Wisconsin’s Legislature created the Nonpoint Source Water Pollution Abatement Program in 1978 to protect lakes, streams, wetlands and ground water in selected priority watersheds by controlling nonpoint pollution sources. For each watershed, the Department of Natural Resources drafts a plan, built on resource and land-use inventories and pollution-source modeling, that sets reduction goals and guides pollution-control strategies called Best Management Practices (BMPs). The USGS monitors whether water quality improves as BMPs are put in, and compares the data with the plans to see whether goals are being met. The barnyards studied were chosen by each plan as critical sources, judged on herd size, lot size, closeness to the stream and how runoff flows downslope.
Two creeks, two samplers each
| Otter Creek | Halfway Prairie Creek | |
|---|---|---|
| Watershed | Sheboygan River Priority Watershed, east-central Wisconsin, 15 miles west of Lake Michigan | Black Earth Creek Priority Watershed, south-central Wisconsin, 20 miles northwest of Madison |
| Drainage area at the downstream station | 9.2 square miles | 16.1 square miles |
| Land use | 67 percent agricultural | 60 percent agricultural |
| Stations installed | March 1994 | April 1995 |
| Storms sampled | 10, from April 1994 to June 1995 | 10, during April to June 1995 |
Each creek had one station upstream of a single barnyard’s runoff and one downstream. A refrigerated sampler, triggered by the rise and fall of the stream, collected the water. Samples were analyzed for total phosphorus, ammonia nitrogen, biochemical oxygen demand (BOD), suspended solids and fecal coliform bacteria, all potential indicators of barnyard pollution.

Barnyard-runoff study site at Otter Creek. Image from the USGS fact sheet.
A design problem, and two fixes
Upstream-downstream sampling has a built-in weakness: small contributions from many upstream sources can drown out the effect of the one being studied. At Halfway Prairie Creek the project added two improvements to the Otter Creek design:
- Rain-triggered, time-integrated sampling. Samplers start when precipitation begins and collect time-integrated samples for an initial period, before water levels rise enough to be sensed. That isolates barnyard runoff from upstream sources and catches small storms in which the barnyard’s contribution is clear but little comes from upstream. Otter Creek will get this for its post-BMP period.
- Stations close enough to be linked. At Halfway Prairie Creek the two stations are wired together, so the two samplers collect concurrent samples, which allows statistical comparison of individual upstream and downstream concentrations.

Barnyard-runoff study site at Halfway Prairie Creek. Image from the USGS fact sheet.
What the storms showed
Loads were computed by summing instantaneous concentration times streamflow over each period of storm runoff, and event-mean concentrations by dividing a load by the runoff volume. At both creeks, event-mean concentrations of total phosphorus, ammonia nitrogen and BOD were generally higher downstream, and a paired Student’s t-test showed average downstream concentrations significantly greater than upstream ones at the 95-percent confidence level. The sheet concludes that each barnyard is an important contributor to those three pollutants in its creek for the storms monitored.
- Otter Creek. Storms 1 and 2 did not follow the pattern of the other eight, most likely because the threshold that started sampling was set too high. A lower threshold would let the downstream station catch the stronger pollution expected early in barnyard runoff.
- Halfway Prairie Creek. Differences were less variable. The early time-integrated samples may have helped isolate barnyard runoff, and similar runoff volumes and little seasonal change between storms may also explain it. Large storms still hid differences, as with storm 8, but concurrent sampling should help by focusing on the start of a storm, when most runoff is local.
How improvement will be judged
After post-BMP monitoring, the USGS and the Department of Natural Resources will decide whether the controls improved water quality. They will compute upstream-downstream differences for before and after storms, giving two independent data sets, and test whether the average difference has fallen significantly. A “minimum detectable change” estimates how large a drop in downstream concentrations must be to count, assuming equal sample sizes of 10 storms and constant variance. The sheet says the values are conservatively high, and that the reductions expected from the BMPs at each site exceed them.
| Minimum detectable change (percent) | Total phosphorus | Ammonia nitrogen | BOD |
|---|---|---|---|
| Otter Creek | 50 | 50 | 40 |
| Halfway Prairie Creek | 10 | 30 | 40 |
Sources
- U.S. Geological Survey, Fact Sheet FS-221-95, Evaluating barnyard Best Management Practices in Wisconsin using upstream-downstream monitoring; the masthead, map fragments and cut-off charts left out; rewritten in hubnx's own words.
Комментарии

Читать дальше
Ещё на тему «Природа»

