NASA had a backup plan for Apollo 11: if the first landing failed, Apollo 12 would try in September, and Apollo 13 in November. Apollo 11 succeeded, so Apollo 12 was pushed to November and Apollo 13 to March 1970, and training shifted to a bigger lunar surface program. Apollo 12 planned to stay on the surface about 35 hours, against Apollo 11’s 21, with two surface spacewalks (EVAs) totaling more than 5 hours.

The Apollo 11 and Apollo 12 landing sites. Image from NASA's page.
A pinpoint landing beside Surveyor 3
On July 29, Apollo Program Director Sam C. Phillips announced that Apollo 12 would aim for a pinpoint landing in the Ocean of Storms (Oceanus Procellarum), near where the robotic Surveyor 3 had landed in April 1967. Several groups liked the site for their own reasons.
| Group | Why |
|---|---|
| Geologists | They wanted astronauts to land inside a crater, as Surveyor 3 had; rays from the bright crater Copernicus, more than 200 miles away, cross the site, so samples might include lunar bedrock blasted out by the impact |
| Mapping specialists | The orbital path would allow good images of the Fra Mauro site considered for Apollo 13 |
| Engineers | Pieces of Surveyor retrieved by the astronauts could show the effects of two and a half years in the harsh lunar environment |
On the first excursion the astronauts would deploy the Apollo Lunar Surface Experiments Package and collect samples, and on the second they would visit Surveyor 3 and remove some equipment.

A panorama taken by Surveyor 3 of its landing site in 1967. Image from NASA's page.
The rockets
Workers in Kennedy Space Center’s Vehicle Assembly Building finished stacking the Apollo 12 Saturn V on July 1, adding the Command and Service Module and the Lunar Module. They mated the spacecraft to the rocket electrically on July 16 and ran more tests before rollout to Launch Pad 39A in early September. The Apollo 13 Saturn V was stacked by July 31, and on Aug. 8 workers rolled it, topped with a dummy spacecraft, out and around to another bay.

Workers lower the Apollo 12 spacecraft onto its Saturn V. Image from NASA's page.
Training
The Apollo 12 prime crew was Commander Charles “Pete” Conrad, Command Module Pilot Richard F. Gordon and Lunar Module Pilot Alan L. Bean. Their backups were David R. Scott, Alfred M. Worden and James B. Irwin. Two training tools were available for the landing itself.
- The Lunar Landing Research Facility at Langley, a 400- by 230-foot A-frame structure with a gantry holding a full-scale lunar module simulator over a floor modelled to resemble the Moon. It simulated the final 150 feet of descent. Scott trained there on July 8, Conrad and Bean on July 31, and Irwin in September.
- The Lunar Landing Training Vehicle, often called “the flying bedstead,” a high-fidelity simulator of the module’s flying characteristics in the last 500 feet of descent. It was challenging to fly and was seen as essential for teaching commanders to land. Conrad flew it on July 9 and 10, and Scott in September.

Conrad flying the Lunar Landing Training Vehicle. Image from NASA's page.
While the Apollo 11 astronauts finished quarantine, Conrad, Bean, Scott and Irwin, with Edward G. Gibson and Harrison H. Schmitt, the only geologist in the astronaut corps, spent three days on a geology field trip in Hawaii. Four geologists led sessions that included recent volcanic eruption sites and simulated moon traverses with the sampling and photography procedures planned for the Moon. On Aug. 13 they visited the Jet Propulsion Laboratory for a briefing on Surveyor and examined an engineering model. Full EVA training began Aug. 26, and on Aug. 29 Conrad practiced moving sample containers aboard a KC-135 aircraft that simulated one-sixth lunar gravity for brief periods.

Scott and Conrad during geology training in Hawaii. Image from NASA's page.
Recovery, and a Soviet probe
On Aug. 17, NASA and the Navy chose the aircraft carrier USS Hornet as Apollo 12’s prime recovery ship, less than a month after it had recovered the Apollo 11 crew on July 24. For the new mission, Captain Carl J. Seiberlich chose the motto “Three More Like Before.”

USS Hornet, the prime recovery ship for Apollo 12. Credit: US Navy.
The Soviet Union had not entirely given up its lunar efforts. On Aug. 8 it launched the unpiloted Zond 7 on a circumlunar mission. Zond 7 looped around the far side of the Moon on Aug. 11 at a distance of 1,235 miles and, on Aug. 14, guided itself to a soft landing in the Soviet Union near the city of Kustanai. It completed the first truly successful flight of the Zond program; after one more flight in 1970 the program was cancelled.