When coastal storms and rising seas broke through the freshwater impoundments at Prime Hook National Wildlife Refuge in Delaware, staff made an unusual decision: rather than keep rebuilding them, they let the freshwater system become a salt marsh. The U.S. Fish and Wildlife Service (USFWS) now presents the project as a case study in nature-based solutions, meaning restoration that works with natural processes and benefits both wildlife and nearby communities.

The main tidal breach into a freshwater impoundment at Prime Hook National Wildlife Refuge

The main tidal breach into a freshwater impoundment. Photo: USFWS.

The problem

The refuge lies along the Atlantic Flyway on Delaware Bay and was established in 1963 to conserve and protect migratory birds. It holds 10,144 acres of hardwood forest, upland grassland, wooded swamp, and freshwater and salt marsh, and is a designated Ramsar Wetland of International Significance. Its central units were built as freshwater impoundments for waterfowl, using water control structures.

Storms and rising seas breached those impoundments, letting saltwater into the freshwater ecosystem, and Hurricane Sandy in 2012 made it worse by sending open water into them. The beach has eroded and moved landward, which weakened the back-barrier dunes that normally buffer the marsh from the ocean, and major storms widened gaps in the dunes and worsened flooding on roads in neighbouring communities. Saltwater made the impoundments unlivable for freshwater species such as pintails, wood ducks, teal, largemouth bass and pickerel, and different waterfowl, fish and plants would take their place.

The response

In 2012 the Service developed a Comprehensive Conservation Plan to restore 4,000 acres of tidal marsh. After Sandy it obtained 38 million dollars in disaster relief funding. Over six years it worked with the local community, NOAA’s National Marine Fisheries Service, the U.S. Army Corps of Engineers Philadelphia, the Delaware Coastal Program and the State of Delaware. The two goals were to rebuild dunes leveled by storms and sea level rise, and to transition freshwater habitat damaged by saltwater into tidal marsh.

Piece of workWhat was done
Seeding1,000 acres of exposed mudflat seeded with over 10,000 pounds of seed from 17 species
Dune and barrier beach1.5 miles of shoreline filled with 1.4 million cubic yards of sand dredged from Delaware Bay; sand fencing built; plugs of brackish dune and marsh plants set to stabilize the back-barrier and create high marsh. Before the storms the profile was nine-foot dunes followed by 100 to 600 feet of back-barrier beach, then marsh
Tidal marsh hydrology21.3 miles of channels dredged across 4,000 acres of former impoundments, which slowed water exchange, spread flow through the marsh and lowered water enough to expose the soils; about 600,000 cubic yards of dredged sediment was side-cast into open water
Data and modelingExisting ecological and hydrological data from the State of Delaware plus Delft3D modeling of tides, circulation and salinity, to assess conditions and test restoration options
CommunityPublic meetings, site visits, presentations, articles and roundtables; neighbours first objected because drained impoundments looked unsightly and their vegetation smelled, then came round as the marsh recovered

Prime Hook Beach after the barrier beach restoration

Prime Hook Beach after the barrier beach restoration. Photo: USFWS.

Lessons the Service draws

  • The design was complex, and significant changes were expected during construction as site conditions varied, so staff had to adapt the plan as they went. With more planning time, the team says it would have let natural hydrology establish and vegetation recolonize before adding dredged material.
  • A multidisciplinary team was key. Staff biologists chose vegetation; staff physical scientists, contracted engineers and Army Corps engineers determined the grain size of sand and the slope the beach needed.
  • Many project staff were hired on a term basis, so capacity has been lost since. Partners helped with biological monitoring before and after, and with geomorphic expertise during tidal restoration.
  • Because the Sandy funding was large, contractors could be chosen for experience and technical skill and not only lowest cost.
  • Community engagement, anchored by several in-person discussions, underpinned success and should begin at the start of a project's design.

What comes next

The refuge plans to keep monitoring surface elevation in the marsh and on the beach, marsh birds such as the saltmarsh sparrow, beach birds including piping plovers and least terns, and vegetation response, using remote sensing and field surveys, and to publish results. It expects that restoring a natural equilibrium that can evolve with changing conditions will help it stay resilient. Storm surge from Delaware Bay remains a long-term concern for the coastal communities, though the Service sees no major foreseeable problems with the restoration itself. Funding came from the Disaster Relief Appropriations Act of 2013 (hurricane resilience and recovery funding) and a Hurricane Sandy monitoring grant from the National Fish and Wildlife Foundation.

Sources

Комментарии

Spinner Logo

Ещё на тему «Природа»

Автор: Hub Nexus Nomad
From the glowing waves of the ocean to fireflies lighting up the night sky, bioluminescence is one of nature’s most mesmerizing phenomena. This article dives into the science behind bioluminescence, its role in nature, and how this glowing phenomenon has inspired both innovation and awe in the human world.
CC0 1.0 (общественное достояние)
Restored Corals are Thriving Three Years after Hurricane Matthew
CC0 1.0 (общественное достояние)
Flood streamflow is typically measured in person, infrequently and usually after the peak. TOADS, a USGS system on a vertical I-beam at the riverbank, profiles water velocity at five depths automatically.
CC0 1.0 (общественное достояние)
Smoke Across North America
CC0 1.0 (общественное достояние)
Volunteers plant native trees at Wuda Ogwa, site of the 1863 Bear River Massacre
CC BY 4.0
Adaptive Evolution