Every year, water-rights holders on the Upper Bear River rebuild dams with heavy equipment. The dams, which are gravel berms pushed up to raise water into irrigation ditches, also block fish and muddy the river. A U.S. Fish and Wildlife Service case study describes how landowners and conservation partners have replaced them with structures that work better for both sides.

A river surrounded by trees. Photo: USFWS.
The river and the problem
The Bear River is the largest tributary of the Great Salt Lake and flows through northeastern Utah, southeastern Idaho and southwestern Wyoming. Its headwater tributaries run mostly across public land, but in the valley bottoms the land is private and used chiefly for agriculture, mostly pasture grasses and hay. The river supports native fish of conservation concern, including Bonneville Cutthroat Trout, Bluehead Sucker, Northern Leatherside Chub and Mountain Whitefish, whose distribution and abundance have recently declined.
Gravel push-up dams serve as irrigation diversions along the mainstem and tributaries from the Uinta Mountains in Utah down to Woodruff Narrows Reservoir in Wyoming. According to the case study they cause several problems:
- Water quality. Annual rebuilding with heavy equipment puts suspended solids into the river.
- Habitat. The altered hydrology leaves shallow pools that quickly fill with sediment, wide shallow riffles and little large wood, and a lack of plant cover that fish need.
- Fish passage. The dams at least partly block fish from reaching spawning sites, and fish are lost from the river into irrigation canals.
- Cost. Water-rights holders face time-consuming, costly yearly maintenance, and landowners lose farmland to rapid bank erosion.
- Coordination. The river is split between Utah and Wyoming, and no state has jurisdiction over the full scope of the issues, which historically held back restoration, so several organizations must work together.
The work
The goals are to improve fish passage by removing or restructuring barriers with natural infrastructure such as rock cross-vane structures, to study how cutthroat trout move around those barriers, and to build collaboration so private lands can stay working ranches.
- Structures and screens. Partners built rock cross-vane structures to replace push-up dams at several diversions and installed three fish screens to keep fish out of canals, where they become easy prey or die when the water is shut off. The changes cut or removed the heavy equipment work and improved water quality.
- Tracking the trout. Trout Unlimited ran a radio-telemetry study of cutthroat trout in the mainstem from 2011 to 2014, with local middle school students taking part in tagging, sampling macroinvertebrates and plotting fish movement; students named the radio-tagged trout in an “Adopt-a-Trout” program. It found that the trout winter in downstream reaches and migrate up to 44 miles upstream to spawn in tributaries in spring, and that about a quarter of the migrating fish were captured in irrigation canals, likely one of the river’s biggest problems.
- Wildlife and landowners. Agencies worked with landowners to improve diversion structures so they meet water needs with less annual work, and planted trees and shrubs beside the diversions and reconnected them to floodplain flows, creating cottonwood and willow habitat.

Restoration work beside a river. Photo: USFWS.
What the partners learned
- One-on-one communication with landowners and water users worked better than large meetings or the internet; a program biologist said it is almost impossible to over-communicate. Landowners provided access and knowledge of the river, and word spread among them.
- Landowners responded to action within one to three years more than to planning efforts that took five years or more before anything happened on the ground. Early results built momentum.
- The movement data showed that fish cross private and public land and that migrating trout are likely to end up in canals, so one fish could be affected by many projects along the river. Landowners were surprised how far the fish travel.
Next
The partners plan to keep rebuilding mainstem diversions, to study fish entrainment in canals to set priorities for screening, to identify sections short of water for flow restoration, to assess the factors that most limit the mainstem cutthroat population, such as passage, water quality or water quantity, and to look at passage and habitat on key spawning tributaries. Funders include the Fish and Wildlife Service’s Partners for Fish and Wildlife Program, USDA programs, Utah and Wyoming state sources, the Western Native Trout Initiative and private groups.
Sources
- U.S. Fish and Wildlife Service, CART case study Restoration for Landowners and Native Fish, Upper Bear River; contact names, the handout thumbnail and the logo left out; rewritten in hubnx's own words.