On Dec. 29, 1980, space shuttle Columbia left the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center for Launch Pad 39A, a major step toward the first shuttle flight, STS-1. NASA’s history office tells the story of the rollout and the pad preparations that followed. Senior managers were optimistic that the first flight could happen as early as March 1981.
Testing in the VAB
Columbia was mated with its external tank and solid rocket boosters on the Mobile Launch Platform (MLP) on Nov. 26, 1980. Engineers powered up the whole stack for the first time on Dec. 4. The STS-1 prime crew, John W. Young and Robert L. Crippen, and their backups Joe H. Engle and Richard H. Truly, ran complex interface tests to verify the mechanical and electrical connections of the mated vehicle. Strapped into Columbia’s cockpit in its vertical position, they flew simulated launch, abort and reentry profiles on the orbiter’s five general-purpose computers. The vehicle was connected to KSC’s launch control system, and flight controllers at the Mission Control Center at Johnson Space Center in Houston received the data too.
Rollout day
At 8 a.m. on Dec. 29, Columbia began its slow rollout, the stack and MLP riding on the Mobile Transporter, also called the crawler. Young, Crippen and KSC Director Richard G. “Dick” Smith spoke to 5,000 visitors, including 200 reporters from around the world. Young called it a great event for the United States, and Crippen called the shuttle “a technological marvel.” Columbia reached Launch Pad 39A by mid-afternoon, completing the 3.5-mile trip down the crawlerway without incident, and workers secured the stack to the pad that evening.
At the pad
Next came the Flight Readiness Firing (FRF), a 20-second final certification test of the orbiter’s main engines, on Feb. 20, 1981. A successful firing would let managers schedule the launch date more precisely. Crews also moved the orbiter crew access arm into position so that astronauts and ground support staff could enter the vehicle.
A few days after watching the rollout, the astronauts joined emergency egress drills and rehearsed how to evacuate Columbia quickly. On Jan. 6, 1981, the prime and backup crews were shown the crew emergency escape system at the pad, commonly called the slide wire:
| Feature | Detail |
|---|---|
| Start | Crew access level of the launch tower, 195 feet above the ground |
| Vehicle | Open baskets carrying pairs of astronauts and support staff |
| Distance | 1,200 feet on slide wires |
| Speed | Up to 60 miles per hour |
| Stopping | Cable brakes and netting at ground level |
| Shelter | A nearby bunker; personnel could also leave in armored personnel carriers |
In the demonstration the astronauts did not actually ride the baskets down.