Space shuttle Discovery's first public appearance was a ceremony, not a launch, and the road from that ceremony to liftoff took months and included two aborted launch attempts. NASA's account of the orbiter's debut follows it from the Palmdale factory floor to its first flight.
On Oct. 16, 1983, NASA's newest orbiter was rolled out at its manufacturing plant in Palmdale, California. Discovery had been under construction for three years and joined Columbia, Challenger and the atmospheric test vehicle Enterprise. The ceremony also featured the astronauts assigned to Discovery's first mission, STS-41D, then planned for launch in June 1984.

Image from NASA's page.
Building Discovery
NASA announced the names of the first four space-worthy orbiters, Columbia, Challenger, Discovery and Atlantis, on Jan. 25, 1979. Like the others, Discovery was named for historical vessels of exploration: Captain James Cook's HMS Discovery, used on his third and final voyage (1776-1779), and Henry Hudson's Discovery, used in his 1610-1611 search for the Northwest Passage.
NASA signed the contract with Rockwell International of Downey, California, to build and deliver Discovery on Jan. 29. Construction began in June 1980 and finished in February 1983. The new orbiter included several upgrades over the two earlier vehicles, and its more extensive use of blankets instead of tiles in the thermal protection system left it 6,870 pounds lighter than Columbia.

Discovery under construction at Palmdale in April 1983. Image from NASA's page.
The rollout ceremony
Hundreds of employees and visitors attended the ceremony on Oct. 16, 1983. Five of the six astronauts assigned to the first mission took part and thanked the assembled workers for building their spacecraft: Commander Henry W. "Hank" Hartsfield, Pilot Michael L. Coats, and Mission Specialists Richard M. "Mike" Mullane, Steven A. Hawley and Judith A. Resnik. Payload Specialist Charles D. Walker could not attend.
From California to Florida
Workers then trucked Discovery 36 miles overland to NASA's Dryden, now Armstrong, Flight Research Center at Edwards Air Force Base, a trip of about 10 hours. A modified Boeing 747, the Shuttle Carrier Aircraft, carried it from there.

Image from NASA's page.
| Date | Step |
|---|---|
| Nov. 6 | First leg to Vandenberg Air Force Base, where workers used Discovery and the carrier aircraft to test the Orbiter Lifting Fixture, a scaled-down version of the mate-demate device planned for use only at Vandenberg |
| Nov. 8 | Overnight refueling stop at Carswell Air Force Base near Ft. Worth |
| Nov. 9 | Arrival at Kennedy Space Center; the next day Discovery was towed to the Orbiter Processing Facility |
| Dec. 9 | Moved to the Vehicle Assembly Building for temporary storage |
| Jan. 10, 1984 | Back to the Orbiter Processing Facility to be prepared for its first flight |
The Vandenberg stop reflected a plan at the time: NASA and the Department of Defense meant to fly shuttles, with Discovery as the designated orbiter, from Vandenberg's Space Launch Complex-6 on military polar orbital missions, starting with STS-62A in 1986. The agencies mothballed those plans after the Challenger accident.
Two aborted launches
On May 12, workers towed Discovery to the Vehicle Assembly Building and mated it to an External Tank and twin Solid Rocket Boosters. The stack rolled out to Launch Pad 39A on May 19. NASA ran a 20-second Flight Readiness Firing of the three main engines on June 2, and the six-person crew took part in a countdown demonstration test on June 14.

Image from NASA's page.
- June 25: the crew boarded, but the launch aborted at the nine-minute mark because Discovery's back-up General Purpose Computer failed. Technicians swapped in a unit from Challenger.
- June 26: the onboard computer aborted the launch four seconds before liftoff, after two of the three main engines had already ignited. Crew member Steven Hawley is reported to have joked that he had expected to be a little higher when the engines shut off. A hydrogen fire at the base of the pad set off the fire suppression system, and the crew left the spacecraft under a deluge of water.
- July 3 to 5: engineers replaced the problem center engine at the pad. The delay made NASA managers shuffle payloads and launch schedules, so Discovery returned to the Vehicle Assembly Building on July 14 and was taken apart, then restacked for the payload changes.
- Aug. 9: Discovery went back to Launch Pad 39A for a launch attempt 20 days later. A hardware problem caused a one-day delay.
On Aug. 30, Discovery lifted off on its first mission.

Image from NASA's page.
A long career
Discovery flew 39 missions over more than 26 years, more than any other orbiter, and virtually every type of mission envisioned for the shuttle: government and commercial satellite deployments and retrievals, launching and servicing scientific observatories such as the Hubble Space Telescope, resupplying the Russian Mir space station, and assembling and maintaining the International Space Station. It also flew the return-to-flight missions after both the Challenger and Columbia accidents. Its final mission, STS-133, flew in February 2011, and the next year the Smithsonian's National Air and Space Museum put it on display at the Stephen F. Udvar-Hazy Center in Chantilly, Virginia.