Space shuttle Enterprise on its mobile launch platform at Launch Pad 39A with a service structure beside it

Enterprise at Launch Pad 39A. Image from NASA's page.

Enterprise was never converted into an orbiter that could fly in space, yet it helped prepare Columbia for its first orbital mission. On July 23, 1979, it finished its time as a pathfinder at Launch Pad 39A at NASA's Kennedy Space Center (KSC) in Florida, and workers towed it back to the Vehicle Assembly Building (VAB). During its four-month stay, it validated procedures for assembling the shuttle stack and its interfaces at the pad, which proved valuable in preparing Columbia for its first orbital mission in 1981. Earlier, Enterprise had shown that the shuttle could fly during atmospheric tests and certified the vehicle's structure for launch loads. Later it supported the Challenger and Columbia accident investigations, and after a restoration it went on public display, near Washington, D.C., and then in New York City.

From a write-in campaign to the first flights

President Richard Nixon directed NASA to build the reusable space shuttle on January 5, 1972. Work on the first components of Orbital Vehicle-101 at North American Rockwell's plant in Downey, California, began on June 4, 1974. The vehicle, designed for ground and atmospheric tests, was named Enterprise after a dedicated write-in campaign by fans of Star Trek. It rolled out at Rockwell's Palmdale facility on September 17, 1976.

WhenWhat
January 1977Trucked 36 miles from Palmdale to Dryden Flight Research Center at Edwards Air Force Base for Approach and Landing Tests, carried on the back of a modified Boeing 747 (the Shuttle Carrier Aircraft)
February 1977Taxi runs, then the first captive inactive flight
June 1977First captive active flight, with a crew aboard the orbiter
August 12, 1977First independent flight; four more approach and landing flights completed the program by October
March 1978First cross-country trip to Huntsville, Alabama; at Marshall Space Flight Center it was mated with an External Tank and inert Solid Rocket Boosters for the first time, followed by a year of vibration tests simulating launch

Enterprise being mated with an External Tank and Solid Rocket Boosters in the test facility at Marshall

Enterprise joins an External Tank and twin Solid Rocket Boosters for vibration tests at Marshall Space Flight Center. Image from NASA's page.

At Kennedy

On April 10, 1979, NASA ferried Enterprise to KSC, removed it from its carrier in the Mate-Demate Device and towed it into the VAB, where on April 25 it was attached to an External Tank and inert boosters on a mobile launch platform repurposed from Saturn rockets. The pad had been modified since Apollo and Skylab, with a fixed launch tower, payload handling accommodations and a mobile service structure.

On May 1 the stack rolled to Pad 39A, the first vehicle on that pad since the Skylab 1 launch in May 1973. With the platform it weighed about 11 million pounds, and the 3.5-mile rollout took about eight hours, at varying speeds to find the one that minimized vibration stress. At the pad Enterprise was used for fit checks and to verify launch procedures, that maintenance platforms mated in the right places, and that crew escape procedures worked. John Bell, who managed the KSC work, called the program very successful, and pad site manager John Talone said it saved the program a lot of time preparing Columbia.

Pilot's-eye view through Enterprise's forward windows of the launch tower

A view through Enterprise's forward windows toward the launch tower. Image from NASA's page.

After the test, Enterprise went back to the VAB on July 23, was taken off its tank on July 25, and was towed to the shuttle landing facility on August 3. The ferry flight to Dryden, August 10–16, made six stops (Atlanta, St. Louis, Tulsa, Denver, Salt Lake City and Vandenberg Air Force Base), and up to 750,000 people came out to see it. It was trucked to Palmdale on October 30, where computers and instruments were removed for other orbiters. Plans to convert it into an orbital vehicle proved too costly.

A long second career

  • 1981–1985: storage at Dryden from September 6, 1981; backdrop for President Reagan's welcome of the STS-4 crew on July 4, 1982; a 1983 European tour (May 13 to June 13) with stops in the United Kingdom, Germany, Italy and France for the Paris Air Show, and in Ottawa on the way back; display at the New Orleans World's Fair from April to November 1984; fit checks at Vandenberg's Space Launch Complex-6, much as at KSC in 1979, until it was ferried back on May 24, 1985.
  • Late 1985: two months of display near the VAB at KSC beside the Saturn V, then Dulles International Airport near Washington, where it arrived on November 18 and was retired and transferred to the Smithsonian, which kept it in a hangar for an 18-year wait for its new home.
  • At Dulles: in 1987, workers winched it into an arresting barrier to test a brake-failure landing, and it tested crew bailout procedures developed after the Challenger accident; in 1990 its cockpit windows served to test-mount an antenna for the Shuttle Amateur Radio Experiment; and in April 2003, after the Columbia accident, investigators borrowed its left landing gear door and part of its port wing for foam impact tests that gave solid evidence for the foam strike as the cause.

Enterprise in storage at Dulles International Airport, with parts of its structure exposed

Enterprise in long-term storage at Dulles. Image from NASA's page.

Home at last

On November 20, 2003, Enterprise was towed into the new display hangar at the Smithsonian's Udvar-Hazy Center, restored for eight months, and put on public display on December 15, 2004. When NASA retired the shuttle fleet in 2011 and donated the vehicles to museums, the Intrepid Sea, Air & Space Museum in New York City acquired Enterprise. On April 19, 2012, workers swapped it for Discovery, and eight days later it landed at John F. Kennedy International Airport. A barge brought it to the Intrepid on June 3, and it went on display July 19. Superstorm Sandy slightly damaged it in October 2012, and it was fully restored.

Space shuttle orbiters Enterprise and Discovery nose to nose at the Udvar-Hazy Center

Enterprise and Discovery nose to nose at the Udvar-Hazy Center. Image from NASA's page.

Sources

Комментарии

Spinner Logo

Ещё на тему «Наука»

Автор: Hub Nexus editors
Top 10 in AI, week of 12 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 2 November 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 26 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 19 October 2026
CC0 1.0 (общественное достояние)
NEW YORK (January 29, 2015) – The NFL, GE (NYSE:GE) and Under Armour (NYSE:UA), today announced that they have joined with the U.S.
CC0 1.0 (общественное достояние)
Sea ice grows throughout the winter and melts throughout the summer, reaching its maximum extent in late February or March, and its minimum extent in September. The ice that survives at least one summer melt season is typically thicker and more likely to survive future summers. Since the 1980s, the