“If you want to go to the Moon, you first have to go through Hancock County, Mississippi.” Locals coined that saying because NASA tested Saturn V rocket stages there. The same test site later proved the space shuttle’s main engines, and it tests engines for NASA’s Artemis missions today.
From Saturn V to the shuttle
On October 25, 1961, NASA announced the decision to build the Mississippi Test Operations in Hancock County, Mississippi, now NASA’s Stennis Space Center. By April 1966 it had been renamed the Mississippi Test Facility (MTF) and was part of NASA’s Marshall Space Flight Center in Huntsville, Alabama.
On April 23, 1966, engineers carried out the first static fire there: a 15-second firing of S-II-T/D, a test variant of a Saturn V second stage, in the A-1 Test Stand. A-1 was renamed the Fred Haise Test Stand in March 2020, after the Apollo 13 astronaut. In the larger B-2 Test Stand, workers completed the first static firing of S-IC-T, a test version of a Saturn V first stage, on March 3, 1967. The facility tested every later Saturn V first and second flight stage, the last on November 4, 1970, for the Saturn V of the cancelled Apollo 19 mission.
After Apollo and Skylab, testing paused briefly. In July 1971 Marshall awarded the Rocketdyne Division of North American Rockwell the contract to design, develop, manufacture and test the reusable Space Shuttle Main Engine (SSME), the most powerful cryogenic engine of its day: 375,000 pounds of thrust at sea level and 475,000 in a vacuum. Testing was to be done at MTF, renamed the National Space Transportation Laboratory (NSTL) in 1974.

The Integrated Subsystem Test Bed, SSME 0001, in Test Stand A-1 at NSTL, now Stennis Space Center, before its first test firing. Image from NASA’s page.
One engine at a time
Ground crews modified Test Stands A-1 and A-2 to fire single SSMEs. Rocketdyne completed the prototype, SSME 0001, also called the Integrated Subsystem Test Bed (ISTB), in March 1975. It was larger and heavier than a flight engine. Its first test, without ignition, came on May 19, 1975, and its first ignition on June 24 in Test Stand A-1.
The second and third development engines were tested in 1976 and 1977, with more than 150 firings and a cumulative run time of 3,500 seconds. The tests turned up significant technical problems, especially in the engine’s high-pressure fuel turbopump. On May 10, 1978, the fifth engine became the first to run at 100 percent of rated power for a full flight duration of 520 seconds. By the end of 1978 the SSME test program had accumulated more than 34,000 seconds in 394 firings.
Three engines at once
Single-engine tests stayed critical, but firing several engines together would show more realistically how the whole propulsion system behaves during a launch. Rockwell’s Space Division in Palmdale, California, which built the shuttle orbiters, built the Main Propulsion Test Article, MPTA-098: a flight-weight shuttle aft fuselage holding three SSMEs and a simulated orbiter midbody. A flight-like External Tank fed it liquid hydrogen and liquid oxygen. Crews installed the MPTA and tank in Test Stand B-2.

Three SSMEs mounted onto the MPTA in Test Stand B-2. Image from NASA’s page.
| Date | MPTA event |
|---|---|
| April 21, 1978 | First static firing. An anomaly stopped the scheduled 2.35-second firing after one second. |
| May 19, 1978 | A 15-second firing, the first major test firing of the shuttle’s main propulsion system. |
| Later tests | A series of 18 firings in all, six of them lasting at least 520 seconds, the expected duration of a shuttle’s powered ascent. Several included gimbaling the engines, which steers the shuttle during ascent. |
| January 17, 1981 | The final test, lasting 625 seconds, about three months before the STS-1 mission. |

The final test of three SSMEs using the MPTA, three months before STS-1, the first launch of space shuttle Columbia. Image from NASA’s page.
To prepare for STS-1, engineers tested 21 engines, including the three that flew on Columbia, in 575 single-engine tests and the 18 MPTA tests, for more than 87,000 seconds of engine run time. The three flight engines began acceptance testing in April 1979. Each went through a 1.5-second start verification, a 100-second calibration firing and a 520-second flight demonstration. They were shipped to Kennedy Space Center and installed on Columbia in July 1980, and a 20-second Flight Readiness Firing at Launch Pad 39A on February 20, 1981, verified they were ready. They performed flawlessly on Columbia’s first launch, April 12, 1981.
The MPTA and its tank stayed in the test stand until February 1988. Repeated thermal cycles from loading cryogenic propellants had broken down the tank’s white foam insulation, so workers replaced it with the same orange foam used on flight tanks.
After STS-1, and on to Artemis
Testing at the site did not end with the first flight. The laboratory was renamed NASA’s John C. Stennis Space Center in May 1988, and each upgrade, including engines run at 104 and 109 percent of rated thrust, needed certification firings. Until the final SSME test in the A-2 Test Stand on July 29, 2009, engineers completed 2,307 test firings totalling 820,475.68 seconds (228 hours) of hot-fire time. The National Park Service declared the test stands a National Historic Landmark in 1985. Over the shuttle program, 46 SSMEs flew on 135 launches, a total of 405 engine missions.
When the shuttle program ended in 2011, Stennis turned to future exploration. On April 4, 2019, technicians finished testing all 16 SSMEs left over from the shuttle program, now called RS-25 engines, which were planned for the core stage of the Space Launch System (SLS) rocket and the Artemis program. A second round, the Green Run, began in January 2020 and ended with a test in the B-2 stand of four RS-25 engines mounted on the SLS core stage for Artemis I. The first test, on January 16, 2021, ended after a little over a minute; a second on March 18 completed the full 500-second firing. The core stage was shipped to Kennedy, and Artemis I launched on November 16, 2022.

A static fire test of an upgraded RS-25 engine in the Fred Haise Test Stand. Image from NASA’s page.
Testing continues at the Fred Haise Test Stand to certify upgraded RS-25 engines for future Artemis deep space missions. NASA closes by repeating the old saying: to go to the Moon, you first have to go through Hancock County, Mississippi.
Sources
- NASA, History, 45 Years Ago: First Main Propulsion Test Assembly Firing of Space Shuttle Main Engines; rewritten in hubnx’s own words.