Перейти к содержимому
Hub Nexus

Автора пока нетВзять себе

Версия 2Обновлено 3 мин чтения

Поддержка

STS-92 was the last space shuttle flight to visit an International Space Station with nobody living aboard. Only three weeks later the first expedition crew moved in. After STS-106, a flight spent on resupplying and outfitting the station's interior, assembly of the outside resumed on STS-92: in 13 days the astronauts installed two elements and made four spacewalks.

Crew patch of STS-92

The seven STS-92 crew members

Left: the STS-92 crew patch. Right: the STS-92 crew members Leroy Chiao, Pamela A. Melroy, Michael E. Lopez-Alegria, William S. McArthur, Peter J. "Jeff" Wisoff, Brian Duffy and Koichi Wakata. Images from NASA's page.

Launch and docking

After several days of weather delays, Discovery launched on the evening of Oct. 11, 2000, the 100th space shuttle mission and the fifth shuttle assembly and resupply flight to the station. Commander Brian Duffy and Pilot Pamela A. Melroy were joined by Mission Specialists Leroy Chiao, William S. McArthur, Peter J. "Jeff" Wisoff, Michael E. Lopez-Alegria and Koichi Wakata. Less than two days later Duffy brought Discovery to a smooth docking with the three-module station at Pressurized Mating Adapter-2 (PMA-2), on the forward port of the Node 1 module, Unity.

Discovery launching on mission STS-92

The three-module International Space Station seen from Discovery during rendezvous and docking

Left: launch of Discovery on STS-92. Right: the three-module station seen from Discovery during rendezvous and docking. Images from NASA's page.

The Z1 truss

The day after docking, Wakata used the Remote Manipulator System to lift the Z1 truss out of the payload bay and move it to Unity's zenith port. Z1 gave the station a framework for attaching its first integrated truss and first solar arrays on the next shuttle flight, and carried four Control Moment Gyros that control the station's attitude without thrusters. It also carried the Space to Ground Antenna (SGANT) for communications with Mission Control through the Tracking and Data Relay Satellite System. After the installation the crew opened the hatches, entered Unity, moved some items across and checked the Z1 berthing.

Four spacewalks

Two pairs of astronauts made four extravehicular activities (EVAs) over four days.

EVADateAstronautsLengthMain work
1Oct. 15Chiao, McArthur6 hours 28 minutesFinished the Z1 installation: umbilicals between Z1 and Unity, then installing and deploying the SGANT
2The next dayWisoff, Lopez-Alegria7 hours 7 minutesHelped install PMA-3 on Unity's nadir port, with Wakata moving it with the arm
3Oct. 17McArthur, Chiao6 hours 48 minutesContinued outfitting Z1, finishing the cable connections
4Oct. 18Lopez-Alegria, Wisoff6 hours 56 minutesCleared Z1's zenith surface for the P6 truss and solar arrays on the next mission, installed a cable tray to power the U.S. Laboratory module due in early 2001, and tested the SAFER gas-propelled backpacks

SAFER is a Shuttle Aid for EVA Rescue backpack meant to bring astronauts back to the station if they became untethered. The source's total for the four spacewalks does not match the sum of its four durations, so no total is given here.

William S. McArthur connecting cables between the Z1 truss and Unity during the first spacewalk

Michael E. Lopez-Alegria installing a cable tray on the Z1 truss during the fourth spacewalk

Left: William S. McArthur connecting cables between Z1 and Unity during the first EVA. Right: Michael E. Lopez-Alegria installing a cable tray on Z1 during the fourth EVA. Images from NASA's page.

Before leaving

On Oct. 19 the crew entered the Zarya module, stowed supplies for the first expedition crew, and retrieved the Protein Crystal Growth-Enhanced Nitrogen Dewar experiment that the STS-106 crew had left aboard Zarya in September. It had spent 46 days in space, and the crystals grown in it were the first experiment results returned from the station. The crew then closed the hatch for the last time on an uninhabited station.

The International Space Station seen from Discovery during departure, with the new Z1 truss at the top and PMA-3 at the bottom

Discovery landing at Edwards Air Force Base, California

Left: the station as seen from Discovery during departure, with the Z1 truss at the top and PMA-3 at the bottom. Right: Discovery's landing at Edwards Air Force Base in California. Images from NASA's page.

Melroy flew Discovery away from the station on Oct. 20 and flew once around it while the crew photographed its condition. Bad weather at the Kennedy Space Center and Edwards Air Force Base kept the shuttle in orbit two extra days. On Oct. 24 the crew closed the payload bay doors, suited up and fired the engines, and Duffy landed Discovery smoothly at Edwards, ending a mission NASA calls highly successful in preparing the station for its first occupants.

Sources

Комментарии

Spinner Logo

Ещё на тему «Наука»

Автор: Hub Nexus editors
Top 10 in AI, week of 12 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 2 November 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 26 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 19 October 2026
CC0 1.0 (общественное достояние)
NEW YORK (January 29, 2015) – The NFL, GE (NYSE:GE) and Under Armour (NYSE:UA), today announced that they have joined with the U.S.
CC0 1.0 (общественное достояние)
Sea ice grows throughout the winter and melts throughout the summer, reaching its maximum extent in late February or March, and its minimum extent in September. The ice that survives at least one summer melt season is typically thicker and more likely to survive future summers. Since the 1980s, the