Перейти к содержимому
Hub Nexus

Автора пока нетВзять себе

Версия 2Обновлено 1 мин чтения

Поддержка

When Skylab was launched in May 1973, one of its solar arrays ripped off during launch and the other became jammed under a metal strap. The crew arrived 11 days later, ready to free and extend the stuck array so it could produce electrical power for the space station, and NASA had quickly gathered some tools for the astronauts to use.

Tool, Wire Cutter, view 1

Image from the Smithsonian National Air and Space Museum’s record for the tool.

A linesman’s tool, modified

This cable cutter is a standard linesman’s tool that was slightly modified for the task in space. The museum’s record says it was probably used before the crew’s launch to develop and practice procedures for cutting the metal strap to release the jammed solar array. The first Skylab crew carried such a cable cutter into orbit and used it successfully during an extravehicular activity, or spacewalk, to make the repair. The tool was transferred from NASA to the museum in 1973.

ManufacturerA.B. Chance Company
Country of originUnited States of America
MaterialsAluminum, steel, Teflon, synthetic fabric cord
Dimensions111.8 × 50.8 × 6.4 cm (44 × 20 × 2½ in.)

Sources

Комментарии

Spinner Logo

Ещё на тему «Наука»

Автор: Hub Nexus editors
Top 10 in AI, week of 26 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 19 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 12 October 2026
Автор: Hub Nexus editors
Top 10 in AI, week of 2 November 2026
CC0 1.0 (общественное достояние)
Achromatopsia
CC0 1.0 (общественное достояние)
Autism prevalence among 8-year-olds was 1 in 59 in 2014. The figure most often missed: 44% of the children identified had an IQ above 85. And while 85% had a developmental concern recorded by 36 months, only 42% had been comprehensively evaluated by then.