Apollo 14's astronauts rehearsed picking up rocks on Earth with a football standing in for a sample, while an armadillo burrowed nearby. NASA's history office looks back at the last weeks of 1970, when the Apollo 14 Saturn V was readied at the Kennedy Space Center (KSC), its crew trained, and the Apollo 15 crew began their own preparations.
The crews
The Apollo 14 crew was Commander Alan B. Shepard, Command Module Pilot Stuart A. Roosa and Lunar Module Pilot Edgar D. Mitchell. Their backups were Eugene A. Cernan, Ronald E. Evans and Joe H. Engle. They rehearsed parts of the mission in simulators. Shepard and Mitchell practiced the surface excursions planned for the Fra Mauro Highlands on a geology field trip to Arizona and in several simulations at KSC.
Building the rocket
| Date | What happened |
|---|---|
| November 8, 1970 | Workers who had stacked the spacecraft atop its Saturn V in the Vehicle Assembly Building (VAB) mounted the Launch Escape System (LES) tower. The LES is used only in an emergency during the first two minutes of powered flight, to lift the spacecraft and crew to safety if the rocket fails seriously |
| The next morning | On the third anniversary of Apollo 4, the first Saturn V flight, the rocket began its rollout. The trip of 3.5 miles to Launch Pad 39A took about 6 hours |
| After rollout | Workers added a spare battery and a third oxygen tank to the Service Module, changes resulting from the accident that crippled Apollo 13 on its way to the Moon in April 1970. They added an accumulator to the second stage to prevent the pogo vibrations that came with Apollo 13's launch and an early engine shutdown |
| Early December | Integrated systems testing of the spacecraft began, leading to a Flight Readiness Test planned for December 17-18 |
Shepard, Roosa and Mitchell watched the rollout and even walked alongside the rocket for a while. Roosa then answered reporters' questions about the mission.
Training for the Moon
Shepard and Mitchell finished their last geology field trip on November 16, to the Black Mesa crater field near Cottonwood, Arizona. Workers blasted 14 new craters beforehand, because heavy rains had eroded earlier ones. The two completed a walking traverse, using the Modular Equipment Transporter (MET) to carry tools and samples, and collected rocks, photographing and describing them while in contact with Mission Control, where a science support team listened and advised them.
The astronauts and their backups practiced the two planned moonwalks in the Manned Spacecraft Operations Building. On the first, they planned to unfold the MET, stowed on the side of the lunar module, set up the scientific experiments and deploy the American flag. Training included removing the nuclear element from the lunar module and putting it into the generator that powers the experiments package. On the second, longer traverses with the MET would collect the bulk of the geology samples. The astronauts also used a "thumper" device to cause small seismic events that sensitive instruments recorded, to inform scientists about the composition of the lunar crust.
Apollo 15 gets going
Apollo 15, planned for July 1971, was the first mission with expanded capabilities: a lunar surface stay of three days and the Lunar Roving Vehicle (LRV). Grumman delivered the lunar module's two stages to KSC, the ascent stage on November 6 and the descent stage 10 days later. Boeing delivered the LRV 1-G trainer to the Marshall Space Flight Center on November 17, and it reached the Manned Spacecraft Center, now NASA's Johnson Space Center, on December 16.
The Apollo 15 crew was Commander David R. Scott, Command Module Pilot Alfred M. Worden and Lunar Module Pilot James B. Irwin. Their backups were Richard F. Gordon, Vance D. Brand and Harrison H. "Jack" Schmitt. The Hadley-Apennine landing site was the first Apollo site away from the Moon's equator, with the 8,000-foot Apennine Mountains and the Hadley Rille, a sinuous canyon 60 miles long, half a mile wide and 600 feet deep. Scott, Irwin, Gordon and Schmitt took a two-day field trip on November 19-20 to the San Gabriel Mountains in California, and the crew spent December 5-12 on the islands of Hawaii and Oahu to learn volcanic terrain. They used a vehicle called the Grover as a stand-in for the rover to make longer traverses than walking allows.
Elsewhere in the world
| Date | Event |
|---|---|
| November 3 | Salvador Allende inaugurated as President of Chile |
| November 17 | Soviet Luna 17 lands on the Moon and deploys the Lunokhod 1 rover; Douglas Engelbart receives a patent for the first computer mouse |
| November 20 | UN General Assembly accepts the People's Republic of China |
| December 2 | The Environmental Protection Agency begins operating |
| December 15 | Soviet Venera 7 becomes the first spacecraft to soft-land on Venus |
| December 21 | President Nixon meets Elvis Presley, an image that is the most requested photograph from the National Archives |