Hub Nexus
Mis à jour

AuteurPas encore d'auteurLa reprendre

Quelque chose à améliorer ? Proposez une modification.

Soutien

This video shows teams from NASA and Northrop Grumman fire a ground-based version of a booster for the agency’s SLS (Space Launch System) rocket June 26. Secured horizontally in a test stand at Northrop Grumman’s test facility in Promontory, Utah, the single five-segment booster motor fired for more than two minutes and produced 3.9 million pounds of thrust. The booster for this test, known as Demonstration Motor-1 (DM-1), is the result of the Booster Obsolescence Life Extension (BOLE) project. This test was the first full-scale ground test of a new five-segment solid rocket motor. During the test, there was an abnormal event approximately 15 seconds before the end of the motor firing. Despite this event, NASA achieved several of the test’s primary objectives and received valuable data on technical risks identified ahead of the test. Testing this evolved booster for the SLS will help evaluate improvements and new materials in the boosters. The BOLE effort was launched to transition to a more efficient, lower cost commercial solution for the boosters for the SLS rocket. Through the Artemis campaign, NASA will send astronauts to explore the Moon for scientific discovery, economic benefits, and to build the foundation for the first crewed missions to Mars – for the benefit of all. For more information, contact NASA Marshall’s Office of Communications at 256-544-0034.

What is said in the film

T minus Fire. T plus 5 seconds. T plus 10s seconds T plus 20 seconds T plus 30 seconds T plus 40 seconds T plus 50 seconds T plus 60 seconds T plus 70 seconds T plus 80 seconds Central Support System Operator enable the deluge CO2 and quench tool controls. Enabled. T plus 90 seconds Open the accumulator enable valve.

Accumulators enabled. T plus 100 seconds Activate aft deluge. Activated. T plus 110 seconds. Activate forward deluge.

Activated. T plus 120 seconds Activated. Activate head end C02. Activated. Activate quench tool forawrd command forward.

Activate aft CO2. Activated. TVC power is disabled. Roger T plus 160 seconds T plus 170 seconds High speed data operators standby.

Where this page came from

This page was imported from NASA. NASA material is generally not copyrighted and is in the public domain.

Nobody has written it yet — it is the source material at a new address, which is why search engines are asked to skip it and why no one earns from it. It is up for grabs: take it on, and it is yours to rewrite and to earn from.

LanguesEnglish

Licence : CC0 1.0 (domaine public) · Adapté de images.nasa.gov

1

0

0

0

Spinner Logo

commentaires

Spinner Logo
Version: 2CC0 1.0 — public domain
The runaway star that left the Tarantula Nebula
Version: 2CC0 1.0 — public domain
The Blackwell School, where segregation had no law behind it
Version: 2CC0 1.0 — public domain
The Eagle Nebula, seen in the infrared
Version: 2CC0 1.0 — public domain
The house where the Equal Rights Amendment was written
Version: 2CC0 1.0 — public domain
The Aleutians, the forgotten front of the Second World War
Version: 2CC0 1.0 — public domain
The Cosmic Cliffs are not cliffs