Before this project, Golden Gate National Recreation Area's facility management division was spread across six buildings — three run by the Presidio Trust and three by the National Park Service. The Great American Outdoors Act (GAOA) paid to rehabilitate 20,000 square feet of Presidio Building PE-643 as a permanent, code-compliant, accessible and efficient maintenance facility. It is now the base for the park's southern operations, which look after park sites in San Francisco and San Mateo counties. The work was done with the Presidio Trust, which manages most of the former Presidio military base.

A long Mission-style building behind a lawn, with trees beyond

Building 643 before construction. NPS photo.

The Presidio and its hangar

A Spanish garrison fortified the Presidio of San Francisco in 1776. It passed to Mexico in 1820 and to the United States in 1848. When Congress ended its life as an active Army post, it was transferred to the National Park Service in 1994 as part of Golden Gate National Recreation Area, and in 1996 Congress created the Presidio Trust to manage parts of it with the Park Service.

The Army built Building 643 in 1923 as an airplane hangar for Crissy Field. By the 1930s the hangars no longer held airplanes; a link was built between the two original hangars and the building became warehouses and offices. It is a contributing structure of the Presidio of San Francisco National Historic Landmark District, an outstanding collection of military architecture, landscape design and planning spanning more than 200 years.

What the work did

  • Demolished the unreinforced masonry parts of the building and removed hazardous materials.
  • Added seismic and structural strengthening.
  • Replaced the roof, windows and doors.
  • Upgraded mechanical, electrical, plumbing and fire-protection systems.
  • Consolidated offices, sign and carpentry workshops, and secure storage for equipment, vehicles and materials.
  • Restored the century-old building's historic look, including "Crissy Field" painted in large block letters on the new roof.

The benefits

  • 20,000 square feet of deteriorating historic building brought from poor to good condition, cutting deferred maintenance and repair costs.
  • Safer workspaces, with fire detection and suppression and hazardous materials removed.
  • One location for the park's South District grounds and operations staff, making operations more efficient and reliable.
  • Park revenue and other funds added to secure the building's long-term use.
  • Accessibility problems fixed to meet code.
Substantial completionDecember 2024
GAOA funding$20.6 million
Other funding$7.4 million
Effect on visitorsnone during construction

Sources

Dans ces publicationsGolden Gate National Recreation Area

LanguesEnglish

Licence : CC0 1.0 (domaine public) · Adapté de www.nps.gov

1

0

0

0

Spinner Logo

commentaires

Spinner Logo
Version: 2CC0 1.0 — public domain
The runaway star that left the Tarantula Nebula
Version: 2CC0 1.0 — public domain
The Blackwell School, where segregation had no law behind it
Version: 2CC0 1.0 — public domain
The Eagle Nebula, seen in the infrared
Version: 2CC0 1.0 — public domain
The house where the Equal Rights Amendment was written
Version: 2CC0 1.0 — public domain
The Aleutians, the forgotten front of the Second World War
Version: 2CC0 1.0 — public domain
The Cosmic Cliffs are not cliffs