logo
업데이트됨

작가Up for Grabs

페이지 내용을 더 낫게 만들고 싶으신가요? 변경을 제안해 보세요.

Hatteras update 1.24

The scaffolding was erected over the month of February. By mid April, the scaffolding was 95% complete. NPS Photo

Updated: March 1, 2024

Scroll to bottom of page to link to previous updates

During the month of February, visitors were able to see the first visible signs of the restoration project as Stone and Lime Historic Restoration Services, Inc began staging equipment and preparing the lighthouse and surrounding grounds for construction.

Contractors closed off the active construction areas and marked pedestrian walkways to ensure uninterrupted access to the Museum of the Sea, Park Store, and restrooms. The grounds are safely open for visitation, but visitors should be aware of the ongoing construction.

Key Highlights from February 2024:

Stone and Lime completed construction staging mobilization. Active construction areas are secured and delineated with fencing.

Gravel has been set around the base of the Lighthouse to allow for a stable foundation for the scaffolding.

Plan to have over 70 truckloads of scaffolding delivered to the Lighthouse grounds throughout the installation process.

The lighthouse will be scaffolded on the exterior and interior, consisting of 28 deck levels reaching a little over 200’ tall!

Scaffolding installation began 2/19 and will proceed through the end of March/early April.

Three levels have been successfully installed. A crane arrived on scene towards the end of the month to facilitate installing the scaffolding at higher levels.

Preparation to begin landscape and hardscape work in March. Working progress will start adjacent to the Museum of the Sea and proceed towards the parking lots.

Artworks Florida continues to work on fabrication of the replica first-order Fresnel lens, having completed several brackets, mountings, and a small section of prisms.

Allen Architectural Metals were on-site to survey and document existing iron work and other metalwork conditions.

Anticipated Highlights for March 2024:

Continued installation of exterior scaffolding and begin installation of interior scaffolding.

Site preparation for the exterior scaffolding elevator/lift delivery.

Mockups for hardscape colors and paint removal methods to be completed.

Visitors to expect increased preparation and work on hardscape pathways, beginning near the Museum of the Sea.

Return to the Restoration Project Landing Page to learn more about the overall project and other updates.

Where this belongs

  • Cape Hatteras National Seashore

Where this page came from

This page was imported from National Park Service. Produced by the U.S. National Park Service and, as a work of the United States government, in the public domain.

Nobody has written it yet — it is the source material at a new address, which is why search engines are asked to skip it and why no one earns from it. It is up for grabs: take it on, and it is yours to rewrite and to earn from.

이 페이지가 속한 컬렉션Cape Hatteras National Seashore

언어English

이용 허락: CC0 1.0 (퍼블릭 도메인) · 출처 www.nps.gov

1

0

0

0

Spinner Logo

코멘트

Spinner Logo
버전: 1관리자: 1컬렉션: 0CC0 1.0 — public domain
Planetary Nebula
버전: 1관리자: 1컬렉션: 0CC0 1.0 — public domain
Doradus Nebula
버전: 1관리자: 1컬렉션: 0CC0 1.0 — public domain
The Tarantula Nebula
버전: 1관리자: 1컬렉션: 0CC0 1.0 — public domain
Hubble reveals heart of Lagoon Nebula
버전: 1관리자: 1컬렉션: 0CC0 1.0 — public domain
Hubble Images Searchlight Beams from a Preplanetary Nebula
버전: 1관리자: 1컬렉션: 0CC0 1.0 — public domain
Hubble View of a Nitrogen-Rich Nebula