Hub Nexus

Prepared in cooperation with the U.S. Environmental Protection Agency Prepared in cooperation with the U.S. Environmental Protection Agency Timeline of Construction and Suspended Sediment and Turbidity Data Collection on the Missouri River By Dale W. Blevins

U.S. Geological Survey, Reston, Virginia: 2006

Historical Measurements .............................................................................................................................1 Suspended Sediment ...........................................................................................................................2 Turbidity ..................................................................................................................................................5 Comparison with Modern Measurements .................................................................................................5 River Velocities ...............................................................................................................................................7 Conclusions and Implications ......................................................................................................................7 References ......................................................................................................................................................8

Figures

  1. Map showing Missouri River Basin with location of historic and modern suspended-

2–4. Boxplots showing:

5–8. Graphs showing:

sediment, turbidity, and velocity sites on the Missouri River ................................................2

  1. Summary of suspended-sediment concentrations before dams, large-scale bank stabilization, and watershed development..............................................................3
  2. Summary of monthly suspended-sediment concentrations in the Missouri River ....4
  3. Turbidity in 10-day composite of grab samples collected in the 1907 water year and turbidity in depth-integrated samples collected from 1973 through 2001 ............5
  4. Turbidity with suspended-sediment concentration at Kansas City, Kansas, in the 1907 water year ...............................................................................................................6
  5. Average annual turbidity at the Kansas City, Kansas, Water Plant, 1918 through 1954 with best-fit fourth-order polynomial trend line ......................................................6
  6. Relation between mean water velocity and discharge in the Missouri River at Waverly, Missouri, as recorded in U.S. Geological Survey discharge measurement notes ..............................................................................................................................8
  7. Relation between maximum water velocity and discharge in the Missouri River at Waverly, Missouri, as recorded in U.S. Geological Survey discharge measurement notes ..............................................................................................................................8

Conversion Factors and Datum

Water year: The 12-month period October 1 through September 30. The water year is designated by the calendar year in which it ends.

For suspended-sediment samples with concentrations less than 10,000 milligrams per liter, the density correction to convert to parts per million is less than 1 percent, which is less than the errors of sample collection and laboratory analysis. Therefore, analytical results in both units are comparable and no conversions of historical analyses from parts per million to milligrams per liter are necessary except for three large concentrations reported by William Clark, Meriwether Lewis, and Edward Harris, which are computed in milligrams per liter for comparison with modern measurements.

By Dale W. Blevins

The heavy sediment load and large amounts of floating debris generated by the constantly caving banks of the Missouri River was documented in the first written description of the river by Father Jacques Marquette in 1673 as he approached the mouth of the Missouri River from the upper Mississippi River:

“[We]” heard the noise of a rapid, into which we were about to run. I have seen nothing more dreadful. An accumulation of large and entire trees, branches, and floating islands, was issuing from the mouth of the river Pekitanoui (Missouri River), with such impetuosity that we could not without great danger risk passing through it. So great was its agitation that the water was so very muddy, and could not become clear.” However, large changes in suspended sediment and turbidity in the lower Missouri River below Gavins Point Dam (fig. 1) have occurred in response to extensive structural changes that have been imposed on the Missouri River and its watershed during the last two centuries. Efforts to shape the channel, remove snags and sawyers, dredge shallows, and stabilize banks for navigation began as early as 1838 (http:// www.lewis-clark.org/ri_mo-snagboats.htm, Chittenden, 1903). However, bank stabilization efforts were sporadic and scattered in comparison to large scale changes that occurred after 1929. In the early 1930s the numerous small channels were combined into a single-fixed channel with 4,745 stone and wood-pile dikes, 3,371 dike extensions, streambank protection works on concave banks, man-made cutoffs, the closing of chutes with dikes, the removal of snags, and dredging (Keown and others, 1981). The resulting navigation channel was 6-ft (feet) deep by 200-ft wide and was expanded to 9 by 300 ft in the 1950s and early 1960s. Construction of six dams was started in 1933 and their reservoirs were filled by 1967. Three of these reservoirs are among the five largest in the United States. Nearly one-third of the Missouri River is now submerged below these massive reservoirs. Since 1967, hydrologic changes have been relatively minor.

In the early 1970s, the U.S. Geological Survey (USGS) began the long-term, systematic collection of suspended-sediment and water-quality data that continues to the present (2006). Because changes in the channel configuration and hydrologic character of the river have been small compared to the changes before 1973, all samples collected after that time are referred to in this report as modern samples. These modern samples compose a large data set that are compared to samples collected before the pervasive hydrologic and channel-stabilizing changes that began in the early 1930s and to the qualitative and semiquantitative observations of the explorers in the early nineteenth century.

Historical Measurements

The largest change in the water quality of the lower Missouri River likely is the decrease of suspended sediment and turbidity, which are of importance to ecological communities, drinking-water utilities, and many other users of the modern river. Characterization of predevelopment suspended-sediment and turbidity concentrations is important to quantify the changes that have occurred. Unfortunately, the rare observations of suspended sediment and turbidity in the Missouri River before 1879 are semiquantitative to descriptive or anecdotal.

 The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

Missouri River Basin with location of historic and modern suspended-sediment, turbidity, and velocity sites on the Missouri River.

Figure 1. Missouri River Basin with location of historic and modern suspended-sediment, turbidity, and velocity sites on the Missouri River.

Meriwether Lewis and William Clark made the first semiquantitative measurements of suspended sediment in 1804 in two ways:

“The water we Drink, or the Common water of the missourie [sic] at this time, contains half a Comn [sic] Wine Glass of ooze or mud to every pint” (Moulton, 1986) (Observed June 21, 1804, by William Clark at a high, but within-bank, stage near present-day Waverly, Missouri)

“Precipitate of one pint of Missouri water weight 80:65 grs (grains) [principally common Clay.]” [Reported by Meriwether Lewis (Moulton, 1986)]. (Collected in 1804 somewhere between present-day Bismarck, North Dakota, and the mouth of the Missouri River.) Edward Harris in an expedition with John J. Audubon made the following observation (McDermott, 1951):

“No otters, beaver, muskrats, or even minks are found in about the turbid waters of this all-mighty stream, the water of which looks more like a hog puddle than anything else I can compare it to. About one-tenth of its bulk forms a despite (deposit) in half an hour.” (Observed May 24, 1843, at a high, but within-bank, stage near present-day Gavins Point Dam) Assuming the porosity of settled sediment was 40 percent, the specific gravity of suspended sediment was 2.6 (Chief of Engineers, 1935), and the size of William Clark’s “wineglass” was 2 fl. oz (fluid ounces; Husted, 1957) the computed sediment concentrations for these observations are:

98,000 mg/L (milligrams per liter; settleable sediment) 1.

(92,000 parts per million) [1 fl. oz x (1 – 0.40 porosity) x 2,600 cm3mg x 2.1 pints ],

11,000 mg/L [Total solids. To estimate suspended-sedi-2.

ment concentration, approximately 400 mg/L dissolved solids is subtracted (Dole, 1909), which results in 10,600 mg/L (10,500 parts per million), (865 grains/pint x 68 )], and

160,000 mg/L (Settleable sediment) (150,000 parts per 3.

million) [(100 cm sediment/liter) x (1 – 0.40 porosity) x 2,600 cm3mg ].

William Teichmann collected and analyzed daily grab samples of total solids from the Missouri River 3 to 4 ft below the water surface from a boat near St. Charles, Missouri, from January 24 through October 10, 1900, (Leighton, 1907). Because Teichmann’s analyses were of total solids, the dissolved-solids concentration, which averaged approximately 400 ppm (parts per million) before the reservoirs in 1907 (Dole, 1909), was subtracted from total-solids concentrations to estimate suspended-solids concentrations. Teichmann’s median of 1,600 ppm was undoubtedly greater than the annual median because Teichmann did not collect samples from October 1, 1899, to January 23, 1900, when the Missouri River was low and correspondingly less turbid. Teichmann’s largest suspended-solids concentration of 4,200 ppm is only 3 to 40 percent of the three semiquantitative measurements recorded by Lewis, Clark, and Audubon.

Grab samples were also collected daily from October 4, 1906, through October 14, 1907, (hereafter referred to as the 1907 water year), composited every 10 days, and analyzed for suspended sediment, total dissolved solids, turbidity, and several other constituents at five sites on the Missouri River as part of a nationwide survey of stream-water quality coordinated and published by Richard Dole of the USGS (Dole 1909; fig. 2). Samples usually were collected in 4-ounce

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

Historical Measurements 

bottles from bridges near the water surface. The median suspended-sediment concentration of the 10-day composite samples was 1,600 ppm at St. Charles, Missouri, and 1,550 ppm at Omaha, Nebraska. For the months corresponding to Teichmann’s sampling period (January to October), Dole’s 1907 median concentration was 2,320 ppm compared to the median of 10-day averages of Teichmann’s daily data in 1900 of 1,800 ppm. The annual maximum concentration in 1907 was 6,330 ppm at St. Charles (fig. 2) compared to 3,000 ppm (again using 10-day averages) for 9 months during 1900. Suspended-sediment concentrations were greater in 1907 likely because the 1907 and 1900 water years had the second largest and fifteenth smallest annual discharges, respectively, in the 52-year period before substantial flow regulation between 1898 and 1950 (Stevens and Hardison, 1951). Despite these differences, Teichmann’s and Dole’s data are much more comparable than the two concentrations computed from the sediment-settling observations of William Clark and Edward Harris (measurements 1 and 3), which are more than 14 times the highest concentration measured by either Dole or Teichmann. This large difference casts some doubt on the accuracy of Clark and Harris’s sediment-settling observations. However, both Clark’s and Harris’s observations were from instantaneous samples made near bankfull stages, whereas Dole’s

 The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

largest concentration is a 10-day composite sample. The instantaneous maximum during that 10-day period undoubtedly was much larger than 6,330 ppm.

The U.S. Army Corps of Engineers collected the first set of daily suspended-sediment samples on the Missouri River at St. Charles, Missouri, from February 1 to October 31, 1879, (Keown and others, 1981). Samples were collected at middepth and 1 ft from the bottom at eight points equally distributed across the river. A physical description of the sampling device was not included in the documentation. The average daily discharge during this period was 83,000 ft/s (cubic feet per second), which is 5 percent less than the modern average annual discharge at Hermann, Missouri (Hauck and Nagel, 2002), just upstream. The average suspended-sediment concentration during this 9-month period was 4,100 mg/L. Despite the less than average discharge, this mean concentration is near the maximum concentration of daily samples collected by Teichman for nearly the same period in 1900 (fig. 2), but substantially less than concentrations computed from the observations of the early explorers.

Another set of suspended-sediment data were collected at eight Missouri River sites by the U.S. Army Corps of Engineers (Chief of Engineers, 1935) from May 8, 1929, to July 22, 1932, before reservoir construction and just preceding and during the initial construction of the first 6-ft deep by 200-ft wide channel. At most sites sample concentrations were plot-

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

ted against daily discharge to develop a sediment-discharge curve that was used to estimate daily and monthly suspended-sediment concentrations. This method was enhanced at most sites with the collection of hundreds of samples during 3 years. Also, samples were collected at equal-width increments across the stream and at up to five different depths to develop methods for collection of representative samples. Consequently, these data, while not all preceding the initial construction of the 6 by 200-ft channel, likely are more representative and reliable than the grab samples collected by Teichmann and Dole. Despite the monthly time step (daily maximums are usually greater than 10-day or monthly-average maximums) and the low discharges between July 1, 1929, and June 30, 1930, the annual maximum of monthly concentrations near St. Charles (6,650 ppm) is larger than the daily maximum reported by Teichmann for 1900 (4,200 ppm) and Dole’s 10- day composites in 1907 (6,330 ppm; figs. 2 and 3). However, the average suspended-sediment concentration in 1879 (4,100 ppm) would fall well within the upper quartile of monthly concentrations at St. Charles, Missouri, from 1929 to 1932. The maximum instantaneous concentration in the 1929 to 1932 data was 12,440 ppm measured in a sample collected on June 4, 1929, at Kansas City, Missouri, at a discharge of 224,000 ft/s (Chief of Engineers, 1935) and a stage about 2 ft over bankfull. This high concentration provides some credibility to Meriwether Lewis’ evaporative measurement (measurement 2)

EXPLANATION

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

of 10,600 mg/L. Conversely, the 1929 to 1932 data cast more doubt on the settleable-sediment observations of Clark and Harris. The median of monthly concentrations in the 1929 to 1932 data, collected 9-river miles upstream from St. Charles, Missouri, was 1,920 ppm (fig. 3), which is more than, but comparable to, Teichmann’s January to October 1900 median (1,600 ppm) of daily samples and Dole’s 1907 median (also 1,600 ppm; fig. 2) of 10-day composite samples. The lower concentrations reported by Teichmann and Dole may partly be caused by under representation of suspended sediment in grab samples collected near the water surface.

The large suspended-sediment concentrations in the uncontrolled river caused it to be so turbid that the water usually was opaque:

“One of the difficulties, the navigator never ceases to contend with, from the entrance of the Missouri to this place (near present-day Bismarck, North Dakota)… [is] the turbed [sic] quality of the water, which renders it impracticable to discover any obstruction even to the debth [sic] of a single inch.” (Meriwether Lewis 1804, in Jackson, 1978). Large concentrations of sediment in the lower Missouri River before major river modifications in the 1930s also are reflected in the large values of turbidity reported by Dole

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

Comparison with Modern Measurements 

(1909; fig. 4). The longitudinal variability of turbidity was small in 1907 as the median, 25th, and 75th percentile values for Kansas City, Kansas, and St. Charles, Missouri, are nearly identical (fig. 4). At Omaha, Nebraska, located above the Platte River and with lower velocities [William Clark (in Moulton, 1986)], the median turbidity was only 13 to 18 percent less than at the other two sites. Turbidity was well correlated with suspended-sediment concentrations (r=0.91; fig. 5) at Kansas City, Kansas, and other sites.

Comparison with Modern Measurements

Historically, suspended-sediment concentrations were reported in parts per million, whereas milligrams per liter are used for modern samples. However, the difference in these units is less than the precision of the laboratory analyses at the concentrations reported, except for the three large concentrations observed by William Clark, Meriwether Lewis, and Edward Harris (measurements 1 to 3), that require corrections for sample density. Therefore, except for these three values, comparisons between historical concentrations in parts per million and modern concentrations in milligrams per liter are reasonable. Comparing post-1972 with pre-1932 data shows how severely suspended-sediment concentrations and turbidity have decreased in the lower Missouri River. The 1973 through

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

2002 median suspended-sediment concentration of 234 instantaneous samples collected at Omaha, Nebraska, is 456 mg/L, which is less than 30 percent of the median suspended-sediment concentration of 10-day composite samples collected in 1907 by Dole (1909; figs. 2 and 3). The modern median is also less than 20 percent of the median of monthly suspended-sediment concentrations at the same city, from July 1, 1929, through June 30, 1932, (fig. 3). The median suspended-sediment concentration at Hermann, Missouri, from 1973 through 2002 is 378 mg/L, which is less than 10 percent of the average concentration in 1879, less than 25 percent of the median concentration in 1907 (fig. 2), and is less than 20 percent of the 1929 to 1932 median concentration near St. Charles, Missouri.

Comparisons of modern data with the three nonsystematic measurements of the early explorers are even more remarkable. Clark’s settleable-sediment measurement near Kansas City, Missouri, is 210 to 270 times the modern median concentrations at Omaha, Nebraska, and Hermann, Missouri, and more than 21 times the maximum concentration measured at these two sites from 1973 through 2002. Although, Meriwether Lewis’ suspended-sediment measurement of 10,600 mg/L is much less than Clark’s and Harris’s observations, it is still more than 6,000 mg/L greater than the maximum concentration measured at Omaha, Nebraska, since 1973.

Average annual turbidity at the Kansas City, Kansas, Water Plant, 1918 through 1954 (U.S. Department of Health, Education, and Welfare—Public Health Service, 1955) with best-fit fo

Figure 6. Average annual turbidity at the Kansas City, Kansas, Water Plant, 1918 through 1954 (U.S. Department of Health, Education, and Welfare—Public Health Service, 1955) with best-fit fourth-order polynomial trend line.

Unfortunately, Dole’s measurements of turbidity in 1907 used a different method and different units (Jackson turbidity units, JTU) than modern measurements (nephelometric turbidity units). Consequently, the measurements are not necessarily equivalent at values greater than about 40 JTU (American Public Health Association, American Water Works Association, and Water Environment Federation, 2005). Nevertheless, the difference between the medians of these two data sets is greater than an order of magnitude (fig. 4), which indicates an exceptional increase in water clarity.

The effects of reservoirs on turbidity also are evident in analyses of samples (using a consistent method of analysis) collected at the Kansas City, Kansas, water-treatment plant from 1918 to 1954 (U.S. Department of Health, Education, and Welfare—Public Health Service, 1955; fig. 6). Fort Peck Dam closed in 1937, Fort Randall Dam in 1952, and Garrison Dam in 1953. Almost immediately turbidity decreased by more than 50 percent. Given the strong relation between turbidity and suspended sediment, the reservoirs likely exacted a similar effect on suspended sediment. Later dams and further bank stabilization likely decreased turbidity even more. These data indicate reservoirs and bank stabilization of the 1950s have decreased turbidity more than the bank stabilization of the early 1930s (fig. 4).

River Velocities

The large historical decrease in suspended sediment and turbidity seems inconsistent with the common assumption that the Missouri River flows much faster than it did before bank stabilization. However, comparison of modern velocity measurements with available measurements made before bank stabilization indicate that while mean velocities are similar, maximum velocities in the lower Missouri River were substantially larger before bank stabilization than maximum velocities measured today. For example, the 25 predevelopment discharge measurements made at Waverly, Missouri, (fig. 1) between October 1928 and May 1930 have mean water velocities that are only 0.2 to 0.8 ft/s (foot per second) slower than mean velocities measured at this same site between October 1993 through September 2002 (fig. 7). However, maximum water velocities before bank stabilization were actually 1.1 to 1.6 ft/s faster than modern maximum velocities (fig. 8). The maximum velocity measured at this same site with a logline by William Clark on June 17, 1804, was 12.5 ft/s (Moulton, 1986), which is close to the maximum high-water velocity of 11.9 ft/s measured in 1929 before bank stabilization. These data refute the hypothesis that the Missouri River was substantially slower before bank stabilization and help explain how the river could suspend such large quantities of sediment and sustain such high turbidity values (fig. 7). Slightly lower mean velocities and substantially higher maximum velocities before bank stabilization indicate the range and spatial variation of water velocity was likely greater before bank stabilization.

Conclusions and Implications

Median suspended-sediment concentrations in the lower Missouri River appear to have decreased by at least 70 to 80 percent from predevelopment conditions, although two semiquantitative sediment-settling observations made by William Clark and Edward Harris indicate even larger reductions in maximum concentrations. Regardless of the amount of reliability that might be ascribed to the Clark and Harris measurements, the decrease in suspended-sediment concentrations and increase in water clarity of the Missouri River is remarkable. Most of this decrease occurred after the closure of dams and massive bank stabilization activities that occured in the 1950s and 1960s. The ecological change that may have resulted from the decrease in suspended-sediment and turbidity has not been documented. However, numerous ecological changes can be postulated from fundamental principles of aquatic ecology (Horne and Goldman, 1994). For example, the greater range in velocities likely resulted in a greater range in turbidity and a greater variety of fish habitat. Also, increased water clarity may permit algal photosynthesis at low river stages providing a new energy source for the food chain and a niche for nonnative planktivorus fish. Increased water clarity should benefit sight-feeding fish, perhaps at the expense of native fish such as catfish, drum, and the endangered pallid sturgeon, that need little light to find food. Thus, the top end of the food chain also may be altered with a potential trophic cascade that could substantially alter the food chain and populations of many species. Conversely, drinking-water suppliers and other users

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River

Relation between maximum water velocity and discharge in the Missouri River at Waverly, Missouri, as recorded in U.S. Geological Survey discharge measurement notes.

Figure 8. Relation between maximum water velocity and discharge in the Missouri River at Waverly, Missouri, as recorded in U.S. Geological Survey discharge measurement notes.

who must remove river sediments benefit from the decrease in suspended material.

References

American Public Health Association, American Water Works Association, and Water Environment Federation, 2005, Standard methods for the examination of water and wastewater, (21st ed.), 900 p.

Chief of Engineers, 1935, Letter from Secretary of War, 73rd Congress, 2nd session, House Document No. 238: United States Government Printing Office, Washington, D.C., 1,245 p.

Chittenden, H., 1903, History of early steamboat navigation on the Missouri River: New York, Francis P. Harper, v. 2, 420 p.

Dole, R.B., 1909, The quality of surface waters of the United States: U.S. Geological Survey Water-Supply Paper 236, 123 p.

Hauck, H.S., and Nagel, C.D., 2002, Water resources data— Missouri, water year 2002: U.S. Geological Survey Water Data Report MO–02–1, 543 p.

Horne, A.J., and Goldman, C.R., 1994, Limnology, (2nd ed): McGraw-Hill, 576 p.

Husted, Mrs. W., ed., 1957, Virginia Cookery Past and Present: The Woman’s Auxiliary of Olivet Episcopal Church Franconia, Virginia, p. 431.

Innis, B., 1985, Sagas of the Smoky-Water: Williston, North Dakota, Centennial Press, 432 p.

Jackson, D., 1978, Letters of the Lewis and Clark Expedition with Related Documents, 1783–1854 (2nd ed.): Urbana, University of Illinois Press, p. 222–25.

Keown, M.P., Dardeau, E.A., and Causey, E.M., 1981, Characterization of the suspended-sediment regime and bed-material gradation of the Mississippi River Basin: U.S. Army Corps of Engineers Waterways Experiment Station Potamology Program Report 1, v. 1, 494 p.

Leighton, M.O., 1907, Pollution of Illinois and Mississippi Rivers by Chicago Sewage: U.S. Geological Survey Water-Supply and Irrigation Paper No. 194, Series L, Quality of Water 20, 369 p.

McDermott, J.F., 1951, Up the Wide Missouri with Audubon: the Journal of Edward Harris: University of Oklahoma Press, 222 p.

Moulton, G., ed., 1986, The Journals of the Lewis & Clark Expedition (v. 2): University of Nebraska Press, Lincoln, Nebraska, 612 p.

Stevens, G.C., and Hardison, C.H., 1951, Monthly and annual discharge of Missouri River between Fort Benton, Montana And Hermann, Missouri, and principle tributaries: U.S: Geological Survey Circular 108, 37 p.

U.S. Department of Health, Education, and Welfare—Public Health Service, 1955, Central Missouri River Water Quality Investigation, 79 p.

Blevins

—The Response of Suspended Sediment, Turbidity, and Velocity to Historical Alterations of the Missouri River—

Where this page came from

This page was imported from U.S. Geological Survey. Published by the U.S. Geological Survey and, as a work of the United States government, in the public domain.

Nobody has written it yet — it is the source material at a new address, which is why search engines are asked to skip it and why no one earns from it. It is up for grabs: take it on, and it is yours to rewrite and to earn from.

LanguagesEnglish

Licence: CC0 1.0 (public domain) · Adapted from pubs.usgs.gov

1

0

0

0

Spinner Logo

Comments

Spinner Logo
Version: 2CC0 1.0 — public domain
The runaway star that left the Tarantula Nebula
Version: 2CC0 1.0 — public domain
The Blackwell School, where segregation had no law behind it
Version: 2CC0 1.0 — public domain
The Eagle Nebula, seen in the infrared
Version: 2CC0 1.0 — public domain
The house where the Equal Rights Amendment was written
Version: 2CC0 1.0 — public domain
The Aleutians, the forgotten front of the Second World War
Version: 2CC0 1.0 — public domain
The Cosmic Cliffs are not cliffs