After record-breaking snow in the winter of 2022–2023, the 69-foot San Joaquin Bridge in Kings Canyon National Park failed catastrophically. It was the main crossing on the John Muir Trail / Pacific Crest Trail (JMT/PCT) for thousands of hikers and horseback riders, and its loss forced them onto long, dangerous detours through rugged country.

The old wooden bridge after a storm, broken and twisted above a raging creek. NPS
A temporary crossing
The Park Service moved quickly, finishing the new bridge in September 2024. In the meantime, the Denver Service Center (DSC) and the construction contractor put in a temporary cable bridge, letting up to 60 backpackers a day cross and greatly easing the disruption.

A PCT thru-hiker crosses the temporary bridge. NPS
Building in the wilderness
The DSC did all the design — plans, specifications and cost estimates — and ran the construction contract, working closely with park staff to account for the site's constraints. The challenges were many:
- a short season, with snow at elevations above 8,300 feet;
- every material flown in by helicopter — and helicopters were scarce during California's long fire season;
- tight deadlines for safety;
- respect for the historic original bridge and the sensitive landscape;
- no helicopter flights during bighorn sheep lambing season.

A helicopter flies in parts of the new bridge, assembled off-site. NPS
Engineers used satellite internet for live video meetings with the crews, improving communication and safety, and solar power and battery-operated equipment to lighten the project's environmental footprint.
Done early, under budget
The bridge was finished ahead of schedule and under budget, awarded and built for $1.25 million, just 17 months after its failure was discovered.

Trail users of every kind — llamas included — were eager to cross the new bridge. NPS
The project, highlighted during Engineers Week 2025, shows how Park Service engineers keep parks accessible and protected — from fragile ecosystems to historic landmarks — even in uncertain times.