A month before Apollo 13 was due to launch, NASA’s plan for its third lunar landing included something new: the Saturn V’s spent S-IVB third stage would be sent on a course to hit the Moon on purpose, instead of into solar orbit. The impact would be detected by the seismometer the Apollo 12 astronauts left behind and would provide information about the Moon’s interior. The Lunar Module’s ascent stage would be sent on an impact trajectory too, once it was no longer needed.
The mission as planned
The 10-day mission was scheduled to launch on April 11, 1970. Commander James A. Lovell and Lunar Module Pilot Fred W. Haise were to land in the Fra Mauro region of the Moon, conduct geologic surveys and set up scientific experiments during two spacewalks, while Command Module Pilot Thomas K. “Ken” Mattingly stayed in lunar orbit making photographic surveys. Their backups were John W. Young, John L. “Jack” Swigert and Charles M. Duke, and the crews continued to train.


Left: Mattingly describing the lunar orbit trajectory to reporters. Right: the Apollo 13 astronauts (left to right) Lovell, Mattingly and Haise holding their mission patch after the preflight press conference. Images from NASA’s page.
Briefing the press
Mattingly met the press on March 9 and the whole crew on March 14 to describe the mission in detail and answer questions. Mattingly described a major change from the two previous lunar landing missions: once in lunar orbit, the Service Module’s propulsion system would perform a descent orbit insertion burn, placing the Command and Service Module, still docked with the Lunar Module, into an elliptical 8-by-66-mile orbit. That conserved Lunar Module propellant for the descent, improving the chances of the pinpoint landing needed for the best science.
The crew showed off their mission patch, which has a painting of three horses symbolizing the three crewmembers and the mission name and number. Instead of names it carries the Latin motto “Ex Luna, Scientia,” meaning “From the Moon, Knowledge,” which stresses the greater emphasis on scientific return from this mission. They also revealed their call signs: Odyssey for the Command and Service Module and Aquarius for the Lunar Module.


Left: map of the Apollo 13 landing site in the Fra Mauro region of the Moon. Right: the plaque with the astronauts’ signatures that was mounted on the leg strut of their Lunar Module Aquarius. Images from NASA’s page.
Practicing the landing
One of the greatest challenges of a lunar mission was a safe landing. Besides simulator time, Apollo mission commanders and their backups trained for the final few hundred feet of the descent in the Lunar Landing Training Vehicle (LLTV) at Ellington Air Force Base, near the Manned Spacecraft Center, now the Johnson Space Center in Houston. On March 9, Lovell completed demonstration flights of the LLTV for assembled reporters and afterward answered their questions.


Left: Apollo 13 Commander Lovell at the controls of the LLTV during a training flight. Right: Lovell speaking with reporters assembled to cover the flight. Images from NASA’s page.
Rehearsing the recovery
The U.S. Navy and NASA designated the USS Iwo Jima (LPH-2) as Apollo 13’s prime recovery ship, and its sailors and Navy Frogmen began training to recover the crew and spacecraft. Procedures to keep the crew in biological isolation, to prevent any possible back-contamination of Earth with lunar pathogens, remained essentially the same as for Apollo 12. Scientists had found no evidence of lunar microorganisms in the Apollo 11 and 12 samples, but because Apollo 13 would visit a different area of the Moon, and out of an overabundance of caution, managers kept the quarantine.
After splashdown, a Frogman would briefly open Odyssey’s hatch and hand the crewmembers clean overalls and respirators. The astronauts would then climb onto life rafts and be lifted one by one onto a helicopter in a Billy Pugh net and taken to the Iwo Jima. With a NASA flight surgeon and an engineer, they would enter the Mobile Quarantine Facility waiting on the ship. Once it was offloaded in Hawaii, a transport plane would carry the facility, with the astronauts inside, back to the Manned Spacecraft Center, where they would enter the Lunar Receiving Laboratory to finish a three-week quarantine.


Left: sailors aboard the USS Iwo Jima practicing recovery operations with a boilerplate Apollo capsule. Right: Frogmen and sailors practicing recovery operations with the capsule. Images from NASA’s page.
Elsewhere that month
The Apollo 12 astronauts Charles “Pete” Conrad, Richard F. Gordon and Alan L. Bean, with NASA and State Department officials, continued their 38-day Bullseye Presidential Goodwill World Tour. After stops in Latin America and a rest stop at Las Palmas in the Canary Islands, they visited Lisbon, Luxembourg, Copenhagen, Helsinki, Bucharest and Vienna; in Africa, Rabat, Tunis, Abidjan, Dar es Salaam and Tananarive in the Malagasy Republic; and then several stops in Asia before returning home.
The source also lists some news from March 1970:
- March 5: the Nuclear Non-Proliferation Treaty went into effect after being ratified by 47 nations.
- March 7: a total solar eclipse passed along the U.S. Atlantic coast region.
- March 10: France made the first successful launch of its new Diamant-B rocket from its new space center in Kourou, French Guiana, placing the DIAL satellite into orbit.
- March 15: the Expo ’70 World’s Fair opened in Suita, a suburb of Osaka, Japan.
- March 31: after 12 years in orbit, Explorer 1, the first American satellite, burned up on reentry.
Sources
- NASA, History, 50 Years Ago: Apollo 13 One Month to Launch; rewritten in hubnx's own words.