When a team of Soviet specialists arrived at Kennedy Space Center the day after a January 27, 1975, docking test, they were the first Russian space technicians ever to visit that NASA center. With the historic first international handshake in space six months away, preparations on the ground for the Apollo-Soyuz Test Project (ASTP) were speeding up. This account from NASA's history office covers January 1975.
Stacking the rocket

Left: workers secure the first stage of the Saturn IB onto the milkstool. Image from NASA's page.

Middle: the second stage is lifted with a mockup of Apollo and Soyuz in the foreground. Image from NASA's page.

Right: workers lower a boilerplate Apollo onto the rocket. Image from NASA's page.
Inside Kennedy's Vehicle Assembly Building, workers set the Saturn IB's first stage on the "milkstool" on January 13, a 128-foot platform atop a Mobile Launcher that let the Saturn IB use the same Launch Umbilical Tower as the far larger Saturn V at Launch Complex 39. The next day they lowered the second stage onto the first, and two days later the Instrument Unit. On January 17 they topped the rocket with a boilerplate Apollo spacecraft, because the flight spacecraft was still being tested in the Manned Spacecraft Operations Building (MSOB).
Crew tests

Left: the prime crew, Stafford, Brand and Slayton, suited up for an altitude chamber test. Image from NASA's page.

Right: the prime crew inside the Command Module. Image from NASA's page.
After a simulated run in December 1974, the prime crew entered the Command Module in the MSOB altitude chamber on January 14, closed the hatch and ran a real test with the chamber simulating altitudes up to 220,000 feet. The crew was Commander Thomas P. Stafford, Docking Module Pilot Donald K. "Deke" Slayton and Command Module Pilot Vance D. Brand. Two days later the backup crew of Alan L. Bean, Ronald E. Evans and Jack R. Lousma completed a similar test.

Left: the backup crew, Bean, Evans and Lousma, suiting up. Image from NASA's page.

Right: Lousma entering the Command Module. Image from NASA's page.
The docking module
The two spacecraft ran at different pressures and gas mixtures and had incompatible docking mechanisms. Engineers solved this with a Docking Module (DM), which served as an airlock and transfer tunnel, and a Docking System (DS) that let the two craft join and the crews visit each other. North American Rockwell in Downey, California, maker of the Apollo spacecraft, built the DM under a NASA contract. Soviet engineers designed the androgynous DS, which the Soviet enterprise NPO Energia built. One end of the DM carried the standard Apollo probe-and-drogue mechanism, the other the androgynous system matching its opposite half on the modified Soyuz.
At launch the DM rode in the Spacecraft Lunar Module Adaptor atop the upper stage, as the lunar module did on Moon flights. In orbit the crew separated the Command and Service Module, turned it around, docked with the DM and pulled it free.
Apollo flew on 100 percent oxygen at 5 pounds per square inch, while Soyuz normally used a nitrogen and oxygen mix at 14.7 psi. So that cosmonauts would not need long breathing of pure oxygen before moving to the lower Apollo pressure, the Soyuz pressure was to be lowered to 10 psi before docking.

Left: the DM (background) and DS (foreground) at the North American Rockwell facility. Image from NASA's page.

Right: workers lowering the DM into Chamber B of the Space Environment Simulation Laboratory at the Johnson Space Center. Image from NASA's page.
After vacuum tests in Chamber B in Houston, the flight DM reached Kennedy on October 29, 1974, for more testing in a vacuum chamber in the MSOB. The flight DS arrived on January 3, 1975, and two weeks later workers fitted it to the Soyuz end of the DM. On January 27 engineers lowered the DM onto the Command Module for a mechanical docking test, as they had before Moon landings with the lunar module.
Soviet specialists in Florida and Houston
The next day, a team of 11 Soviet specialists arrived at Kennedy and, with American colleagues, spent 10 days testing the television and audio equipment the Soyuz would carry for compatibility with Apollo and the DM. They toured Kennedy facilities, including Launch Complex 39, and visited Disney World.

Left: a docking test of the DM with the Command Module at Kennedy. Image from NASA's page.

Right: support astronaut Robert F. Overmyer (at right) with Soviet specialists. Image from NASA's page.
Meanwhile about 80 Soviet personnel arrived in Houston on January 18 for three weeks of meetings with their American counterparts, the last major meeting of the specialists before the July 1975 mission. They were members of the five joint technical working groups that had met periodically since 1971:
- Group 1 prepared for joint simulations planned for March 1975.
- Group 2 worked on emergency procedures for the mission.
- Group 3 reviewed the results of docking system tests.
- Group 4 reviewed results of flight communications system tests.
- Group 5 prepared its final report on the compatibility of the spacecraft's life support systems and certified the equipment to be transferred between the two vehicles.
Top managers Boris N. Petrov of the Soviet Academy of Science and Konstantin D. Bushuyev, the USSR's ASTP project director, arrived a few days later for meetings of the management team, Working Group Zero. Glynn S. Lunney, who had been Gemini and Apollo flight director, was the American ASTP manager. The account ends "To be continued…".
Sources
- NASA, "45 Years Ago: Six Months to ASTP Joint Mission" (https://www.nasa.gov/history/45-years-ago-six-months-to-astp-joint-mission/); rewritten in hubnx's own words. Three photographs of the working-group meetings, whose captions cannot be matched to the pictures, are left out.