Автора пока нетВзять себе
- Лицензия
- CC0 1.0 (общественное достояние)По материалам www.blm.gov
- Языки
- English
The Bureau of Land Management (BLM) proposed updates to its regulations with two aims: to make it easier for broadband providers to put new infrastructure on public lands, and to address the risks of wildfire to and from powerlines on BLM-administered lands. The proposal ties into the Bipartisan Infrastructure Law, signed in November 2021, which sets priorities of reliable high-speed internet for every American and a more reliable, secure and resilient power grid.

A communications site (photo: BLM-California).
Why the BLM is involved
The law provides $65 billion to expand broadband access, make service more affordable, and address digital equity and inclusion, through programs run by the Department of Commerce. It also puts priority on keeping infrastructure resilient to the effects of climate change, including wildfires.
BLM Director Tracy Stone-Manning said broadband access is essential today for work, study and staying healthy, connected and safe, especially in rural and tribal communities, which often live close to public lands. Updating the rules, she said, would support closing the digital divide, reduce wildland fire safety risks and protect infrastructure investments that matter to local and national economies.
Private companies and cooperatives decide where to build or upgrade broadband. But the Department of the Interior administers a significant amount of land and already-permitted infrastructure that can be used to extend connectivity in rural America. Broadband can be built in a communications site right-of-way (ROW), and BLM-administered public lands are often uniquely suited to serve rural and tribal communities, where access to broadband continues to lag.
| On BLM-managed lands | Amount |
|---|---|
| Communications sites with cellular or wireless towers | about 1,500 |
| Energy corridors for power transmission, compatible with fiber optic and phone lines | 5,000 miles |
BLM energy corridors connect to another thousand miles of similar corridors on National Forest lands. The BLM authorizes both communications sites and power grid infrastructure as rights-of-way.

Transmission towers in a Southwest desert (photo: BLM).
Powerlines and wildfire
Tree limbs and other vegetation in powerline rights-of-way that are not maintained on a regular schedule can ignite fires or fuel fires that start elsewhere. That threatens public safety, the security and reliability of the grid, and resources in and next to the corridors. In 2018 Congress added language to the Federal Land Policy and Management Act requiring enhanced vegetation management in electric utility rights-of-way on public lands to reduce wildland fire risk. The proposed rules are meant to make sure ROW holders have operations and maintenance plans that meet what Congress intended.

Clearing vegetation from utility corridors lowers the chance that fire starts in them or burns through them, which can damage powerlines and interrupt service (photo: BLM-California).
The BLM also said an advanced telecommunications network is critical to supporting growth, helping small businesses, creating jobs, strengthening the first-responder network in remote areas and keeping communities competitive in the information-age economy.

The BLM sought public comment on the proposed changes; the comment period was to close on January 6, 2023.
Sources
- Bureau of Land Management, Expanding connectivity, safeguarding infrastructure, written by Heather Feeney, Public Affairs Specialist, with photos by BLM-California; rewritten in hubnx's own words.
Комментарии




