Автора пока нетВзять себе
- Лицензия
- CC0 1.0 (общественное достояние)По материалам www.epa.gov
- Языки
- English
Montgomery County, Maryland, set up a team to move redevelopment permits through quickly in downtown Silver Spring. The Green Tape program strives to issue permits within two weeks of receiving an application. That is not always possible for very large, complex projects, but developers are usually surprised by the speed. EPA uses it as a case study of the smart growth principle of predictable, fair and cost-effective decision-making.
Why the county acted
Downtown Silver Spring was a dynamic retail center in the post-war years but, like many inner suburbs, lost many of its stores to enclosed malls during the 1970s. Later attempts to rebuild the retail base failed. When investors could not find funding for a proposed shopping center in 1996, the county decided to redevelop the area as a pedestrian-oriented, mixed-use, transit-oriented community.
To clear obstacles, the county executive asked the Department of Permitting Services to speed up permitting and inspection in the Silver Spring redevelopment zone.
How Green Tape works
- The team draws on every part of the department: building, electrical, fire, mechanical, accessibility, zoning, sediment and stormwater management, subdivision plan review, and inspection codes and standards.
- Applicants get help with filing requirements, regulatory reviews and inspections, and team members prioritize applications from the zone.
- Pre-design consultations and assessment inspections have proven valuable. Team members meet applicants before a project is designed and visit the site to spot obstacles and suggest fixes. The consultations have also helped business owners find zoning and code issues that might make a project infeasible, which saves time and money and keeps properties out of litigation.
- Projects include new construction, rehabilitation, retrofits and other changes to buildings, from converting a town home into an office to the 500,000-plus square foot headquarters of Discovery Communications. Discovery vacated that building in 2018; as of 2020 it is being redeveloped.
Two examples
Designers wanted a fountain in a public square. Green Tape staff from the health inspection office recommended remote water-testing technology, so the fountain could meet health code standards without onerous manual testing.
The Auras Building also had a pre-design inspection and meeting. The team recommended design changes that let an open staircase serve as a required fire exit.

Reuse of this historic building required design flexibility to incorporate an existing staircase as a fire exit. Image from EPA's page.

This former bottling plant is being transformed into new apartments. Image from EPA's page.

Discovery Communications' decision to base its headquarters in downtown Silver Spring provided an anchor for the office market. Image from EPA's page.
The result
The market has responded by proposing over 750,000 square feet of retail and entertainment space, 500,000 square feet of office space and more than 4,000 residences. EPA published the case study in 2006 with a minor update in 2021.
Sources
- U.S. EPA, "Make Development Decisions Predictable and Fair: Green Tape Program, Silver Spring, Maryland," Smart Growth Illustrated (https://www.epa.gov/smartgrowth/make-development-decisions-predictable-and-fair-green-tape-program-silver-spring); rewritten in hubnx's own words.
Комментарии




