Arieal view of waist high red-brick walls and white window frames surrounding a glass cube with archeological remains.

With support from the Independence Historical Trust and the National Park Foundation, Independence National Historical Park is working to preserve the President's House Site. NPS image

Location

The President's House Site is located on the corner of 6th and Market Streets, just north of the entrance to the Liberty Bell Center.

Project Overview

The Condition Assesment of the President's House Site project will identify threats to the exposed archeological site and determine deficiencies in the current glass enclosure, surrounding structures, HVAC systems, and lighting. The assessment will provide technical guidance for Independence NHP on necessary repairs, stabilization of the site, and recommendations for ongoing maintenance.

The President’s House Site is an in-ground archeology exhibit that preserves and interprets the site of America’s first executive mansion. From 1790 to 1800, Philadelphia served as the capital of the new nation. George Washington and John Adams lived and worked in what became known as the “President’s House”. An archeological excavation of the site in 2007 revealed surviving portions of the building’s foundations, including the partial foundation of a “bow window”, which is believed to be the precursor of the Oval Office in the White House.

Salt and bio growth near 18th century brick, surrounded by dirt

Areas of concern near the archeological remains at the President's House Site NPS image

The current site includes an in-ground archeological exhibit that displays parts of the building foundations of the executive residence, as well as those of buildings that were built atop the site following the demolition of the house in 1832. The archeological portion of the exhibit (completed in 2010) is enclosed in a glass structure that has been subject to ongoing issues that have negatively impacted the site. Areas of concern include damage to historic masonry from water leakage, delamination of plaster wall remnants on the historic masonry, build-up of efflorescence salt deposits, and areas of biological growth.

Project Timeline

The park began planning for the assessment in summer 2024 and anticipates completion by the end of calendar year 2025.

This project was made possible in part by a grant from the National Park Foundation

Where this belongs

  • Independence National Historical Park

Where this page came from

This page was imported from National Park Service. Produced by the U.S. National Park Service and, as a work of the United States government, in the public domain.

Nobody has written it yet — it is the source material at a new address, which is why search engines are asked to skip it and why no one earns from it. It is up for grabs: take it on, and it is yours to rewrite and to earn from.

LanguagesEnglish

Licence: CC0 1.0 (public domain) · Adapted from www.nps.gov

Views

Comments

Spinner Logo
CC0 1.0 (public domain)
The runaway star that left the Tarantula Nebula
CC0 1.0 (public domain)
The Eagle Nebula, seen in the infrared
CC0 1.0 (public domain)
The Cosmic Cliffs are not cliffs
CC0 1.0 (public domain)
The recommended targets are real, but the largest health gain is between doing nothing and doing a little. That is the part worth knowing if you are starting from nothing.
CC0 1.0 (public domain)
Sleep is not one state but a cycle through several, each doing different work. Most sleep disorders are a failure to complete that cycle rather than a shortage of hours.
CC0 1.0 (public domain)
Four nebulae that revealed the shape of our galaxy